Part 4. Appendices 4.5 Checklists
Construction Plan Approval for Infrastructure Projects Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √, n/a, or w Application Submittal Requirement √, n/a, or w
8 For each sewer and water main connection to be made to planned/existing mains that are, or to be, built outside the scope of this project, list which infrastructure actually exists at this time and which is planned infrastructure. Include the project numbers 9 Reclaimed Water • Reclaimed Water • Design of the reclaimed water system should follow the standards in place. All public Reclaimed water system must be designed to meet TOC Standard Specifications Section 06500. Click here for specifications. • Provide information on pipe sizing and material. • Reclaimed Waterlines along major roadways shall be designed to meet the Town of Cary's Reclaimed Water System Master Plan: Click here for additional information. • Show air release valves on lines 6 inches and above. H Soil Erosion Control Plan - see Wake County Environmental Services for requirements I Lighting Plan 1 Location of proposed lighting fixtures (See Section 5.15, Exterior Lighting, of UDO.) pole details, including height, color, and manufacturer 2 Fixture details, including color, graphic, shape, wattage, IESNA cutoff classification, lumen rating, and manufacturer. This includes both pole and fixtures affixed to building. 3 Footcandle grid (Not required on public streets) 4 Summary table that shows minimum, average and maximum FC values as well as the average to minimum uniformity ratio (Not required on public streets) 5 Maintenance factor (Not required on public streets) 6 Streetlight pole locations (This does include thoroughfares adjacent to the project) J Roadway Plan 1 Plan/Profile Sheet • Sufficient field survey beyond property lines for sight distance and/or transition to existing roadway • Proposed roadway design criteria • Layout adequately dimensioned, radius • Existing and proposed utilities 2 Pavement marking and street signage plan in accordance with the Manual of Uniform Traffic Control Devices and/or NCDOT standards 3 Cross section 4 Pavement design K Details Sheet 1 Standard details L Stormwater Report 1 Runoff Calculations report for all proposed storm drainage structures including, but not limited to culverts, storm drain systems, inlets, ditches, open channels, BMPs, outlet protection, etc. The report shall be sealed and signed by a registered North Carolina Professional Engineer. 2 Narrative description of Existing Conditions, Natural Resource Inventory, Stormwater Management Plan, calculations (methods, variables, assumptions, etc.) and results. 3 Copy & .xls file of completed Storm-EZ form 4 Maps
• Pre- and Post-Development Drainage Area Maps (on full-size plan sheet) • BMP drainage area map (include area of BMP itself) (on full-size plan sheet) • Inlet drainage area map (on full-size plan sheet) • USGS Quad map (identify site) • FIRM map (identify site) • Wake County Soil Survey (1970) map (identify site) 5 Runoff coefficient calculations
Morrisville, NC
May 29, 2020
Administrative Manual
Page 44
Made with FlippingBook flipbook maker