Administrative Manual - Nov 2026

Part 4. Appendices 4.5 Checklists

New Telecommunication Facility Construction Plan Approval for a Site Plan (Major or Minor) Submittal Checklist For each listed item, check ( √ ) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √ , n/a, or w Application Submittal Requirement √ , n/a, or w 16 Location, height, and material of any fence, berm, and wall existing or proposed 17 VUA table that includes: • Square footage of VUA area • Number of required plantings, with supporting calculation (See Section 5.12.4.D, Interior Landscaping Standards, of UDO.) • Number of provided plantings 18 Location of planting strips and/or tree pits proposed to contain required street trees (See Section 5.12.6, Street Trees in the TOD and MS Districts, of UDO.) 19 Tree Protection Areas 20 The following note: All landscaping shall be maintained in perpetuity 21 The following note: All hotboxes and other on ground/free standing mechanical equipment shall be screened with vegetation prior to the issuance of a Certificate of Compliance/Occupancy K Lighting Plan 1 Location of proposed lighting fixtures (See Section 5.15, Exterior Lighting, of UDO). Pole details, including height, color, and manufacturer 2 Fixture details, including color, graphic, shape, wattage, IESNA cutoff classification, lumen rating, and manufacturer. This includes both pole and fixtures affixed to building. L Details Sheet 1 Fence (see Section 5.14, Fences and Walls, of UDO) 2 Standard details M Elevations Facility Elevations 1 Label all facility materials and colors 2 Label each side of the facility at north, south, east, west 3 Label the overall facility height 4 The scale of the elevations 5 Location of each on-facility light fixture (not exceeding FAA minimum standards) 6 Location of screen wall for ground level mechanical equipment including shadow (height and width) of the equipment Compound Building Elevations 1 Label all building materials and colors (façade, cornices, awnings etc.) 2 Label each side of the building at north, south, east, west 3 Label the number of stories 4 Label the overall building height and the height of each story 5 The height of structures above the roofline (e.g. parapets and towers) 6 The scale of the elevations 7 Location of each on-building light fixture (not exceeding FAA minimum standards) 8 Location of roof-mounted mechanical equipment including proposed screening and a shadow (height and width) of the equipment 9 Location of screen wall for ground level mechanical equipment including shadow (height and width) of the equipment 10 Location of all utilities attached to the building

Morrisville, NC Administrative Manual

November 1, 2026 Page 76

Made with FlippingBook - Online Brochure Maker