Comprehensive Transportation Plan - March 2019
PROJECT SHEETS
Airport Boulevard Extension
2010 – n/a New Location and Grade Separation
Length 0.77 miles
Project Extents
Phase 1: NC 54 to Church Street Phase 2: Church Street to Garden Square Lane
Traffic Volume (vpd) Street Hierarchy 2010 – N/A 2040 – 28,971 Major Thoroughfare Congestion (v/c ratio)
Planning Cost Estimate July 2017 Phase 1: $25,383,000 Phase 2: $5,525,520 Crash Summary (June 2013 to May 2016) N/A
2010 – N/A 2040 – 0.63
CROSS-SECTION
KEY INTERIM BUILD DIMENSIONS
FULL BUILD-OUT DIMENSIONS NOTES:
12-ft inside lane 15-ft wide outside lane
2 11-ft inside lanes 1 12-ft dedicated bus lane
Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. For speeds below 35 MPH, sharrows shall be provided in the wide outside lanes. The provision of a wide median is intended to reduce future construction costs along corridors that may need widening to 6-lanes to accommodate dedicated bus lanes.
31.5-ft planted median
17.5-ft planted median
5-ft minimum verge
0-ft to 10-ft verge
10-ft sidepath south side of roadway
10-ft sidepath
5-ft sidewalk
5-ft sidewalk
N/A
N/A
C-5 | PAGE
Made with FlippingBook - professional solution for displaying marketing and sales documents online