Town Hall Drive Extension

2010 – n/a New Location

Length 0.70 miles

Project Extents

From: Ferntree Court To: McCrimmon Parkway

Traffic Volume (vpd) Street Hierarchy 2010 – N/A 2040 – N/A Collector Street Congestion (v/c ratio)

Planning Cost Estimate July 2017

2010 – N/A 2040 – N/A

$ 6,582,000 Crash Summary (June 2013 to May 2016) N/A

CROSS-SECTION

KEY STANDARD DIMENSIONS

ALTERNATIVE DIMENSIONS

NOTES:

12-ft lanes

11-ft to 14-ft lanes

Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. Sharrows shall be provided if 14-ft lanes are constructed.

5-ft minimum verge

0-ft to 10-ft verge

N/A

10-ft sidepath(s)

5-ft sidewalks

5-ft to 8-ft sidewalks

C-16 | PAGE