Comprehensive Transportation Plan - March 2019
PROJECT SHEETS
Marcom Drive Extension
2010 – n/a New Location
Length 0.90 miles
Project Extents From: Current Terminus near Sorrel Grove Church Road To: Paramount Parkway
Traffic Volume (vpd) Street Hierarchy 2010 – N/A 2040 – N/A Collector Street Congestion (v/c ratio)
Planning Cost Estimate July 2017
2010 – N/A 2040 – N/A
$ 2,508,000 Crash Summary (June 2013 to May 2016) N/A
CROSS-SECTION
KEY STANDARD DIMENSIONS
ALTERNATIVE DIMENSIONS
NOTES:
11-ft lanes
12-ft to 14-ft lanes
17.5-ft planted median
17.5-ft to 23-ft planted median
Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. Sidepaths can be provided in lieu of on-street bicycle accommodations. Sharrows shall be provided if 14-ft lanes are constructed.
5-ft minimum verge
0-ft to 10-ft verge
N/A
10-ft sidepath(s)
5-ft sidewalks
5-ft to 8-ft sidewalks
5-ft to 6-ft bike lanes with optional buffer
5-ft bike lanes
1 Resolution 2022-396-0: CTP amendment approved Oct. 25, 2022 removed a portion of Marcom Drive Extension from the plan.