Comprehensive Transportation Plan - March 2019
NC 54 (Chapel Hill Road)
2010 – n/a Widening
Length 0.30 miles
Project Extents
From: NW Cary Parkway To: Wilson Road Traffic Volume (vpd) Street Hierarchy
2010 – 24,366 2040 – 26,566
Major Thoroughfare
Planning Cost Estimate July 2017
Congestion (v/c ratio)
2010 – 1.31 2040 – 1.43
$ 5,152,000 Crash Summary (June 2013 to May 2016) Total Crashes – 27 EPDO Score – 226.8
CROSS-SECTION
KEY STANDARD DIMENSIONS
NOTES:
11-ft inside lanes
12-ft dedicated bus lanes
Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. Bus lanes can be center-running or in the outside lanes as shown in the cross-section.
17.5-ft planted median
0-ft to 10-ft verge 10-ft sidepath east side of roadway 5-ft sidewalk
C-14 | P A G E