Comprehensive Transportation Plan - March 2019
Town Hall Drive Extension
2010 – n/a New Location
Length 0.70 miles
Project Extents
From: Ferntree Court To: McCrimmon Parkway
Traffic Volume (vpd) Street Hierarchy 2010 – N/A 2040 – N/A Collector Street Congestion (v/c ratio)
Planning Cost Estimate July 2017
2010 – N/A 2040 – N/A
$ 6,582,000 Crash Summary (June 2013 to May 2016) N/A
CROSS-SECTION
KEY STANDARD DIMENSIONS
ALTERNATIVE DIMENSIONS
NOTES:
12-ft lanes
11-ft to 14-ft lanes
Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. Sharrows shall be provided if 14-ft lanes are constructed.
5-ft minimum verge
0-ft to 10-ft verge
N/A
10-ft sidepath(s)
5-ft sidewalks
5-ft to 8-ft sidewalks