Comprehensive Transportation Plan - March 2019
Supports Transit Routes Projects that align with existing and proposed transit routes were awarded 1 point. PRIORITIZATION RESULTS
The outcomes of this prioritization process are reflected in Table 5-8 and Figure 5-3 . It is important to note that the prioritized projects shown here are not financially constrained – this list is independent of potential revenues and should be used as a guide to help advocate for future funding. The prioritization process is intended to serve as a tool that allows for flexibility in the order in which projects are implemented. This flexibility allows funding partners such as the Town, NCDOT, and CAMPO to be opportunistic and to take advantage of future revenue as it becomes available. Roadway Facility Improvements Members of Town Council and the Planning and Zoning Board were shown the results of the roadway prioritization process discussed above, and used the results to inform the classification of projects as near-term, mid-term, and long-term. The full list of prioritized roadway recommendations is included in Table 5-8 and shown in Figure 5-3 . Prioritization is an effective way to help guide the allocation of future resources. However, the ultimate timeline for implementing these improvements is subject to funding availability. Responsibility for implementing these improvements will be a blend of State, local, and private funding and management. Table 5-8: Prioritized Roadway Improvements 1 CORRIDOR EXTENTS IMPROVEMENT GUIDING PRINCIPLES ADDRESSED Near-Term Recommendations (less than 15 years) Airport Boulevard Extension Phase 1 NC 54 to Church Street New Location and Grade Separation Airport Boulevard Extension Phase 2 Church Street to Current Terminus near Garden Square Lane New Location Crabtree Crossing Parkway & Morrisville Parkway Intersection Improvements Davis Drive Wake County Northern Limits to Morrisville-Carpenter Road Widening Davis Drive & Parkside Valley Drive Intersection Improvements
Davis Drive & McCrimmon Parkway
Intersection Improvements
Davis Drive & Morrisville-Carpenter Road
Intersection Improvements
Davis Drive & Morrisville Parkway
Intersection Improvements
McCrimmon Parkway & Church Street
Intersection Improvements
Perimeter Park Drive to Weston Parkway
NC 54
Widening
Weston Parkway to NW Cary Parkway NW Cary Parkway to Wilson Road
Widening
NC 54
NC 54
Widening
At-Grade Intersection Improvements
NC 54 & Morrisville-Carpenter Road
NC 54 & Keybridge Drive
Intersection Improvements
Slater Road & Carrington Mill Boulevard
Intersection Improvements
GUIDING PRINCIPLES LEGEND
Culture & Environment Enhance the Town’s quality of life by preserving and promoting its valued places and natural assets. Growth & Development Make travel more efficient by coordinating transportation investments with land use decisions. Safety & Security Promote a safe and secure transportation system by reducing crashes and improving emergency response.
Economic Vitality Support the local economy by making it easier to move people and freight around and through the Town. Mobility & Accessibility Provide a balanced transportation system that makes it easier to walk, ride a bike, and take transit. System Preservation Improve the transportation system’s longevity by emphasizing maintenance and operational efficiency.
1 Project sheets for select projects are available in Appendix C.
5-10 | PAGE
Made with FlippingBook - Online Brochure Maker