Part 1. Introduction | 7 |
1.1. Purpose | 7 |
1.2. For Help in Using this Manual | 7 |
1.3. Development Review Process Chart | 7 |
Part 2. Application Review Procedures | 10 |
2.1. Introduction | 10 |
2.2. Standard Review Procedures | 10 |
2.2.1. Pre-Application Conference | 10 |
2.2.2. Application Submittal and Acceptance | 10 |
2.2.3. Staff Review and Action | 11 |
2.2.4. Public Meeting Notice | 11 |
2.2.5. Planning and Zoning Board Review and Recommendation | 11 |
2.2.6. Board of Adjustment or Town Council Review and Decision | 12 |
2.2.7. Post-Decision Actions | 12 |
2.3. Common Application Procedures | 12 |
2.3.1. Site Plan Approval | 13 |
2.3.2. Subdivision Approval | 13 |
A. Preliminary Plat Approval | 13 |
B. Final Plat Approval | 14 |
C. Determination of Subdivision Exclusion | 14 |
2.3.3. Construction Plan Approval / Stormwater Management Permit | 14 |
2.3.4. Payment in Lieu of Public Improvements, Performance Guarantees, and Maintenance Guarantees | 14 |
A. Payment in Lieu of Construction of Public Street Improvements | 14 |
B. Performance Guarantees | 15 |
C. Maintenance Guarantees | 15 |
2.3.5. Pre-Construction Conference, Notice, and Report | 15 |
A. Pre-Construction Conference | 15 |
B. Pre-Construction Notice | 16 |
C. Pre-Construction Report | 16 |
2.3.6. Building Permit | 16 |
2.3.7. Inspections during Development | 16 |
2.3.8. Stormwater Final Inspection and As-Built Plans | 17 |
2.3.9. Certificate of Compliance/Occupancy | 17 |
2.3.10. Sign Permit | 17 |
2.4. Additional Application Procedures | 17 |
2.4.1. Annexation | 17 |
A. General | 17 |
B. Voluntary Annexation Procedure | 18 |
2.4.2. Bulletin Drawing | 18 |
A. General | 18 |
B. Bulletin Drawing Approval Procedure | 18 |
2.4.3. Comprehensive Plan Amendment | 19 |
A. General | 19 |
B. Comprehensive Plan Amendment Review Procedure | 19 |
2.4.4. Conceptual Master Plan Approval | 20 |
2.4.5. Floodplain Development Permit | 21 |
2.4.6. Food Truck Permit | 21 |
2.4.7. Grave Removal | 21 |
A. General | 21 |
B. Grave Removal Approval Procedure | 21 |
2.4.8. Interpretation | 22 |
2.4.9. Plot Plan | 22 |
2.4.10. Retaining Wall | 22 |
A. General | 22 |
B. Retaining Wall Review Procedure | 23 |
1. Design and Submittal Requirements | 23 |
2. Construction Requirements | 23 |
3. Post Construction | 23 |
2.4.11. Right-of-Way Encroachment Agreement | 24 |
2.4.12. Riparian Buffer Development Review | 24 |
2.4.13. Road Closure | 24 |
A. General | 24 |
B. Road Closure Procedure | 24 |
2.4.14. Road Renaming | 25 |
A. General | 25 |
B. Road Renaming Procedure | 25 |
2.4.15. Site-Specific Development Plan Designation | 25 |
2.4.16. Special Event Permit | 26 |
2.4.17. Special Use Permit | 26 |
2.4.18. Telecommunications Facility Approvals | 26 |
2.4.19. Unified Development Ordinance Amendments | 27 |
A. Rezoning (Map Amendment) | 27 |
B. Text Amendment | 28 |
2.4.20. Zoning Compliance Letter | 28 |
2.5. Procedures for Flexibility, Variances, and Appeals | 28 |
2.5.1. Administrative Adjustment | 28 |
2.5.2. Administrative Appeal | 28 |
2.5.3. Alternative Equivalent Compliance | 29 |
2.5.4. Alternative Standards | 29 |
2.5.5. Development Agreement | 29 |
2.5.6. Variance | 30 |
A. General Variance Review Procedure | 30 |
B. Riparian Buffer Variance Review Procedure | 30 |
C. Stormwater Variance Review Procedure | 30 |
Part 3. Outside Agency Permits and Approvals | 31 |
3.1. Local Agency and Utility Approvals | 31 |
3.1.1. Wake County Erosion and Sedimentation Control Regulations | 31 |
3.1.2. Wake County Road Name Approvals | 31 |
3.1.3. Town of Cary Water and Sewer Approvals | 31 |
3.1.4. Other Utilities | 31 |
A. Duke Energy Progress | 31 |
B. PSNC Energy | 31 |
C. Telecommunication Services | 31 |
3.2. State Agency Permits and Approvals | 32 |
3.2.1. NCDOT Driveway Permits, Right-of-Way Encroachment Agreements, Street Design | 32 |
3.2.2. North Carolina Department of Environmental Quality Permits and Approvals | 32 |
Part 4. Appendices | 35 |
4.1. Town Documents Related to Land Development | 35 |
4.1.1. Comprehensive Plan | 35 |
4.1.2. Regulations and Guidelines | 36 |
4.1.3. Brochures, Examples, and Miscellaneous Agreements/Petitions | 37 |
4.2. Contacts | 37 |
4.2.1. Town of Morrisville Contacts | 37 |
A. Development Services Administration | 37 |
B. Planning Department | 37 |
C. Engineering Department | 38 |
D. Engineering Department – Stormwater | 38 |
E. Inspections Department | 38 |
F. Fire Department | 38 |
G. Parks, Recreation, and Cultural Resources Department | 39 |
H. Public Works | 39 |
4.2.2. Outside Agency Contacts | 39 |
A. Duke Energy Progress | 39 |
B. PSNC Energy [Natural Gas] | 39 |
C. State of North Carolina | 39 |
D. Town of Cary | 40 |
E. Wake County | 40 |
4.3. Plant Lists | 40 |
4.3.1. Recommended Trees and Shrubs | 40 |
4.3.2. Xeriscape and Native Vegetation Guide | 43 |
4.3.3. Herbaceous Plants Suitable for Sunny, Dry Conditions | 47 |
4.4. Applications, Permits, and forms | 48 |
4.4.1. Development Application | 48 |
4.4.2. Annexation Petition | 48 |
4.4.3. Assessment Inquiry Request Form | 48 |
4.4.4. Food Truck Permit Request Form | 48 |
4.4.5. Home Occupation Permit Request Form | 48 |
4.4.6. Performance Guarantee Release/Reduction Request Form | 48 |
4.4.7. Sign Permit Application | 48 |
4.4.8. Special Event Permit Request Form | 48 |
4.4.9. Street Vendor Permit Request Form | 49 |
4.4.10. Stockpiling Permit Application | 49 |
4.4.11. Telecommunication Application | 49 |
4.4.12. Zoning Compliance Letter Request Form | 49 |
4.5. Checklists | 50 |
4.5.1. Site Plan Approval (Major or Minor) | 50 |
4.5.2. Construction Plan Approval for a Site Plan (Major or Minor) | 59 |
4.5.3. Preliminary Subdivision Plat Approval (Type 1 or Type 2) | 69 |
4.5.4. Construction Plan Approval for a Type 1 or 2 Preliminary Subdivision Plat | 76 |
4.5.5. Construction Plan Approval for Infrastructure Projects | 83 |
4.5.6. Administrative Adjustment | 88 |
4.5.7. Administrative Appeal | 89 |
4.5.8. Alternative Equivalent Compliance | 90 |
4.5.9. Alternative Standards (EDCM) | 90 |
4.5.10. Bulletin Drawing | 91 |
4.5.11. Comprehensive Plan Amendment | 92 |
4.5.12. Conceptual Master Plan Approval | 93 |
4.5.13. Development Agreement | 94 |
4.5.14. Final Plat | 94 |
4.5.15. Food Truck Permit | 97 |
4.5.16. Floodplain Development Permit | 97 |
4.5.17. Interpretation | 97 |
4.5.18. Plot Plan | 98 |
4.5.19. Retaining Wall | 99 |
4.5.20. Riparian Buffer Development Review | 100 |
4.5.21. Riparian Buffer Variance | 100 |
4.5.22. Structures in the Right-of-Way Encroachment Agreement | 101 |
4.5.23. Rezoning | 102 |
4.5.24. Sign Permit | 102 |
4.5.25. Site-Specific Development Plan Designation | 105 |
4.5.26. Special Event Permit | 106 |
4.5.27. Special Use Permit | 107 |
4.5.28. Stormwater Variance | 108 |
4.5.29. Street Vendor | 109 |
4.5.30. Telecommunications Facility Collocation/Modification | 110 |
4.5.31. Telecommunications Facility New Tower | 111 |
4.5.32. Variance Submittal | 118 |
4.6. Fee Schedules | 120 |
4.6.1. Application and Inspections Fee Schedule | 120 |
4.6.2. Map, Plans, and Copying Fee Schedule | 120 |
4.7. Certifications and Approval Blocks | 121 |
4.7.1. Acceptance of Public Dedication | 121 |
4.7.2. Certificate of Approval of the Design and Installation of Streets, Public Utilities, and Other Required Improvements | 121 |
4.7.3. Certificate of Approval for Recording | 121 |
4.7.4. Review Officer Certification | 121 |
4.7.5. Tree Preservation Certificate | 122 |
4.7.6. Certificates of Ownership | 122 |
A. Subdivision Plat | 122 |
B. Exempt Plats | 123 |
4.7.7. Cross Access Agreement | 123 |
4.7.8. Exempt Plat Certification | 124 |
4.7.9. Review Officer Certification Surveyor’s Certificate and Seal Certifying the Following | 124 |
4.7.10. Town of Cary | 124 |
4.7.11. Site Plan/Construction Drawing/Minor Modification | 125 |
4.7.12. Bulletin Drawing | 125 |
4.8. Final Plat Standard Easement Blocks | 125 |
4.8.1. Conservation Easement | 125 |
4.8.2. Entry Monument/Signage and Landscape Easement | 126 |
4.8.3. Private Access Easement | 126 |
4.8.4. Private Open Space | 126 |
4.8.5. Private Retaining Wall Easement | 126 |
4.8.6. Public Access Easement | 126 |
4.8.7. Public Greenway Easement | 126 |
4.8.8. Public Sidewalk Easement | 127 |
4.8.9. Public Utility Easement | 127 |
4.8.10. Sight Triangle Easement | 127 |
4.8.11. Storm Drainage Easements | 127 |
A. Private Storm Drainage Easement | 127 |
B. Public Storm Drainage Easement | 127 |
4.8.12. Stormwater Control Measure and Access Easement | 128 |
4.9. Review Schedules | 128 |
4.9.1. Board of Adjustment Decision Review Schedule | 128 |
4.9.2. Staff Decision Review Timeframes | 130 |
4.9.3. Town Council Decision Review Schedules | 131 |
A. Administrative Review Schedules | 131 |
1. Major Site Plan and Type 1 Subdivision Preliminary Plat | 131 |
2. Site Specific Development Plan Designation / | 132 |
3. Right-of-Way Encroachment Agreement | 133 |
B. Legislative Review Schedules | 134 |
1. Comprehensive Plan Amendment and General Rezoning | 134 |
2. Conceptual Master Plan and Planned Development Rezoning | 135 |
3. Conditional Rezoning | 136 |
C. Quasi-Judicial Review Schedules | 137 |
1. Special Use Permit and Alternative Equivalent Compliance Review Schedule | 137 |