Morrisville UDO Administrative Manual, August 1, 2018 version

Part 4 Appendices 4.6 Fee Schedules

4.6. FEE SCHEDULES

Application and Inspections Fee Schedule

A completed fee schedule must be submitted with each development application, unless otherwise stated in this Manual. To help ensure the appropriate fee is paid, all fees are automatically calculated. The downloadable fee schedule is located here. To complete the schedule:

Add an “x” in the left column next to the fee description.

Add the unit value (e.g., acres, units, etc.), if applicable, to two decimal places. Do not round. For example, 12.03 acres is entered as 12.03 not 12.00.

Print completed form and submit with development application.

Please call the Planning Department at (919) 463-6210 for additional information.

Map, Plans, and Copying Fee Schedule

Map, Plans, and Copying Fee Schedule (July 1, 2018 – June 30, 2019)

Description

Fee

Total

Custom Map

Base map fee + $130 per hour

One digital version and one hard copy from plotter

_____Hour(s)

Files on DVD/CD Rom

CD Rom

$6

DVD

$8

Hard Copies of Plans and UDO

Land Use Plan

$20

Town Center Plan

$40

Transportation Plan (2009 Version)

Free

Unified Development Ordinance

$40

Other Plans Not Listed Above

$40

Paper Copy Fees – the fees are doubled for color copies

8 ½” x 11” (one/two sided)

15¢ per Copy

_____Copy(s)

8 ½” x 14” (one/two sided)

20¢ per Copy

_____Copy(s)

11” x 17” (one/two sided)

25¢ per Copy

_____Copy(s)

$8 first sheet, $1.50 each add’l sheet $5 first sheet, $1.00 each add’l sheet

Site Plans & Construction Plans (Full Size)

_____Sheet(s)

Site Plans & Construction Plans ( 11” x 17”)

_____Sheet(s)

File Retrieval

$60 per file/specific record

Off-Site File Retrieval Fee

_____file/specific record(s)

Plotter Copy Fees – the fees are doubled for color copies

$7 first sheet, $1.50 each add’l sheet $9 first sheet, $1.50 each add’l sheet $13 first sheet, $1.50 each add’l sheet

17” x 22” (Size C)

_____Copy(s)

22” x 34” (Size D)

_____Copy(s)

34” x 44” (Size E)

_____Copy(s)

August 1, 2018

Morrisville, NC

Page 4-86

Administrative Manual

Made with FlippingBook - Online magazine maker