Morrisville UDO Administrative Manual, August 1, 2018 version

Part 4 Appendices 4.2 Contacts

Engineering Design and Construction Manual (EDCM) The Engineering Design and Construction Manual provides minimum criteria for the design and construction of new infrastructure and development within the town. It is intended to help design professionals, developers, contractors, and residents comply with the Unified Development Ordinance (UDO). The Manual supplements the UDO with additional or more detailed standards for grading, retaining walls, street design, sidewalks, fire lanes, driveways, parking lots, and stormwater management. It also includes provisions regarding contractor responsibilities during construction. Click on the image to open the EDCM.

Brochures, Examples, and Miscellaneous Agreements/Petitions

Riparian Buffer Brochure

This brochure includes information about what a riparian buffer is and what activities are or are not allowed in the buffer.

Wake County Single Lot Erosion Control

Wake County does not require an Erosion and Sedimentation Control (E&SC) permit when building on an individual lot and disturbing less than one acre. However, the County does require a property owner to install minimum E&SC measures for all lots regardless of size of disturbance. Click on the image to see the specific requirements.

4.2. CONTACTS

Town of Morrisville Contacts

A. Development Services Administration

Amy Lindley Development Services Coordinator (919) 463-6181 alindley@townofmorrisville.org Diane Boyd Permit Technician (919) 463-6177 dboyd@townofmorrisville.org

Marty Saunders Planning Technician (919) 463-6188 msaunderes@townofmorrisville.org

Jill Meyer Permit Technician (919) 463-6187 jsmeyer@townofmorrisville.org

B. Planning Department Courtney Tanner Planning Director (919) 463-6199 ctanner@townofmorrisville.org

Michele Stegall Current Planning Manager (919) 463-6196 mstegall@townofmorrisville.org

Kari Grace Planner II – Current Planning (919) 463-6194 kgrace@townofmorrisville.org

Morrisville, NC

August 1, 2018

Administrative Manual

Page 4-3

Made with FlippingBook - Online magazine maker