Morrisville UDO Administrative Manual, August 1, 2018 version
Part 4 Appendices 4.5 Checklists
Site Plan Approval (Major of Minor) Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations.
Staff Use Only
√, n/a, or w
√, n/a, or w
Application Submittal Requirement
3 The site area and the corresponding watershed area for the proposed improvements shall be delineated on the mapping 4 USGS Quad map (identify site) 5 FIRM map (identify site) 5 Wake County Soil Survey (1970 version) map (identify site) 7 Runoff coefficient calculations Rational Formula (up to 5 acres) SCS Method 8 Stormwater Quality (85% TSS removal)/Quantity Best Management Practices (BMPs) 9 Stormwater BMP detention routing (1, 2, 10, 25, and 100-year storm event) Q Other 1 Keynotes are not permitted
August 1, 2018
Morrisville, NC
Page 4-24
Administrative Manual
Made with FlippingBook - Online magazine maker