Morrisville UDO Administrative Manual, August 1, 2018 version
Part 4 Appendices 4.5 Checklists
Construction Plan Approval for a Site Plan (Major or Minor) Submittal Checklist (use this checklist for concurrent review applications) For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only
√, n/a, or w
√, n/a, or w
Application Submittal Requirement
5 Runoff coefficient calculations
Rational Formula (up to 5 acres) SCS Method (discrete CN method) 6 Time of concentration for pre/post development conditions
7 Analyze pre-development and post-development runoff conditions for each discharge point from the site 8 No net increase from pre-development peak flow for 1-yr, 2-yr, & 10-yr, 24-hr storm events 9 Roof drain & leader calculations (designed per the NC Plumbing Code) 10 Storm Drain System Design Calculations Pipe material – RCP, minimum pipe diameter of 15 inches, minimum slope of 0.5% Pipes carry the 2-yr storm at a velocity of at least 2 10-yr (contained in pipe) & 25-yr (contained in structures) HGL calculations & profiles Swale calculations showing non-erosive flow for 10-yr storm Gutter spread calculations for 4 in/hr storm (8ft max spread) Culvert calculations (energy equation & nomographs) Rip rap apron calculations/nomographs 11 Stormwater Quality (85% TSS removal)/Quantity Best Management Practices (BMPs) Stormwater BMPs must be designed in accordance with the NCDENR Stormwater BMP Design Manual , or the Minimum Design Criteria (MDC) , and any supplements to it issued by the Town of Morrisville including the Town of Morrisville EDCM and Policy or Technical Memorandums, Stormwater BMP detention routing (1, 2, 10, 25, and 100-year storm events) Provide 1 foot of freeboard from the top of any dam embankment during the 100-year storm event Permanently stabilized emergency spillway must be provided Water Quality Computations and BMP sizing/drawdown for the 1-inch (1”) runoff depth
12 Nutrient Calculations
Hardcopy (of all tabs) & .xls file of completed J/F Nutrient Loading Accounting Tool
13 BMP Operation and Maintenance manual
Engineers estimate for BMP. Provide detailed, line-item bid summary with item/activity description, unit price, amount of units, and total cost. Maintenance surety calculation (30% cash payment) Draft O&M agreement with site-specific data included for review prior to execution and recordation
R Other 1 Keynotes are not permitted
August 1, 2018
Morrisville, NC
Page 4-34
Administrative Manual