Part 4 Appendices 4.5 Checklists
Construction Plan Approval for Infrastructure Projects Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √, n/a, or w Application Submittal Requirement √, n/a, or w
7 Location of proposed lighting fixtures (See Section 5.15, Exterior Lighting, of UDO.)Pole details, including height, color, and manufacturer J Roadway Plan 1 Plan/Profile Sheet Sufficient field survey beyond property lines for sight distance and/or transition to existing roadway Proposed roadway design criteria Layout adequately dimensioned, radius Existing and proposed utilities 2 Pavement marking and street signage plan in accordance with the Manual of Uniform Traffic Control Devices and/or NCDOT standards 3 Cross section 4 Pavement design K Details Sheet 1 Standard details L Stormwater Report 1 Runoff Calculations report for all proposed storm drainage structures including, but not limited to culverts, storm drain systems, inlets, ditches, open channels, BMPs, outlet protection, etc. The report shall be sealed and signed by a registered North Carolina Professional Engineer. 2 Narrative description of Existing Conditions, Natural Resource Inventory, Stormwater Management Plan, calculations (methods, variables, assumptions, etc.) and results. 3 Hardcopy & .xls file of completed Storm-EZ form 4 Maps
Pre- and Post-Development Drainage Area Maps (on full-size plan sheet) BMP drainage area map (include area of BMP itself) (on full-size plan sheet) Inlet drainage area map (on full-size plan sheet) USGS Quad map (identify site) FIRM map (identify site) Wake County Soil Survey (1970) map (identify site)
5 Runoff coefficient calculations
Rational Formula (up to 5 acres) SCS Method (discrete CN method) 6 Time of concentration for pre/post development conditions
7 Analyze pre-development and post-development runoff conditions for each discharge point from the site 8 No net increase from pre-development peak flow for 1-yr, 2-yr, & 10-yr, 24-hr storm events 9 Roof drain & leader calculations (designed per the NC Plumbing Code) 10 Storm Drain System Design Calculations Pipe material – RCP, minimum pipe diameter of 15 inches, minimum slope of 0.5% Pipes carry the 2-yr storm at a velocity of at least 2 10-yr (contained in pipe) & 25-yr (contained in structures) HGL calculations & profiles Swale calculations showing non-erosive flow for 10-yr storm Gutter spread calculations for 4 in/hr storm (8ft max spread) Culvert calculations (energy equation & nomographs) Rip rap apron calculations/nomographs 11 Stormwater Quality (85% TSS removal)/Quantity Best Management Practices (BMPs) Stormwater BMPs must be designed in accordance with the NCDENR Stormwater BMP Design Manual , or the Minimum Design Criteria (MDC) , and any supplements to it issued by the Town of Morrisville including the Town of Morrisville EDCM and Policy or Technical Memorandums, Stormwater BMP detention routing (1, 2, 10, 25, and 100-year storm events) Provide 1 foot of freeboard from the top of any dam embankment during the 100-year storm event