DRAFT Comprehensive Transportation Plan Update: 06/06/2018 version

PROJECT SHEETS

Marcom Drive Extension

2010 – n/a New Location

Length 0.90 miles

Project Extents

From: Current Terminus To: Watkins Road Traffic Volume (vpd) Street Hierarchy Collector Street Congestion (v/c ratio) Planning Cost Estimate

2010 – N/A 2040 – N/A 2010 – N/A 2040 – N/A

$ 2,508,000 Crash Summary (June 2013 to May 2016) N/A

CROSS-SECTION

KEY STANDARD DIMENSIONS

ALTERNATIVE DIMENSIONS

NOTES:

11-ft lanes

12-ft to 14-ft lanes

17.5-ft planted median

17.5-ft to 23-ft planted median

Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. Sidepaths can be provided in lieu of on-street bicycle accommodations. Sharrows shall be provided if 14-ft lanes are constructed.

5-ft minimum verge

0-ft to 10-ft verge

N/A

10-ft sidepath(s)

5-ft sidewalks

5-ft to 8-ft sidewalks

5-ft to 6-ft bike lanes with optional buffer

5-ft bike lanes

C-10 | P A G E D R A F T | 0 6 / 0 6 / 2 0 1 8

Made with FlippingBook - Online Brochure Maker