DRAFT Comprehensive Transportation Plan Update: 06/06/2018 version

INTRODUCTION

· The Crabtree-Hatcher Creek greenway, Morrisville’s longest greenway at 2.5 miles, began construction in April 2017. Once completed the greenway will link Davis Drive to Evans Road. · The Town’s local law enforcement participated in the Watch for Me NC campaign at local schools to promote active transportation as a safe means of for Town residents. Regional Partnerships Morrisville has been involved in regional planning initiatives that shaped the direction and future of the Town. · Morrisville was an active stakeholder in the development of the Wake County Transit Plan which outlined the expansion of regional local bus service and the development of bus rapid transit and commuter rail. · Participation in the Triangle Bikeway Plan and Wake County Greenways Plan resulted in regional systems connecting into the Town’s bicycle and pedestrian network. · The Town’s collaboration with CAMPO, NCDOT, and the Town of Cary resulted in funding to implement a coordinated signal system. Table 1-1: 2009 Transportation Plan Status Report PROJECT NAME FROM TO STATUS 1 Airport Blvd Widening NC 54 I-40 Completed NC 54 Widening NC 540 McCrimmon Parkway Funded in 2018-2027 STIP Davis Dr (North) Widening McCrimmon Parkway Northern Town Limits Completed Davis Dr (South) Widening Southern Town Limits Southern of Airport Boulevard Completed Triangle Pkwy NC 540 NC 147 Completed Louis Stephens Dr NC 540 Louis Stephens Drive (RTP) Funded in 2018-2027 STIP Kit Creek Rd Reconnection Davis Drive Kit Creek Road Completed McCrimmon Pkwy Widening Louis Stephens Drive NC 54 Funded in 2018-2027 STIP 2 Morrisville-Carpenter Rd Widening Western Town Limits NC 54 Funded/Estimated Completion 2019 3 Morrisville Carpenter Rd @ Town Hall Dr Intersection Improvements Church Street Morrisville Square Way Complete Aviation Pkwy Widening NC 54 Eastern Town Limits Funded in 2018-2027 STIP International Drive Extension International Drive (north) Airport Boulevard Not Funded McCrimmon Pkwy Extension (Phase II) Airport Boulevard International Drive Extension Under Construction 4 Morrisville East Connector Airport Boulevard International Drive Extension Not Funded McCrimmon Pkwy Extension (Phase I) NC 54 Perimeter Park Drive Under Construction Airport Boulevard Grade Separation Airport Boulevard NC 54 Not Funded Airport Blvd Extension Airport Boulevard in Cary NC 54 Not Funded NC 54 Widening McCrimmon Parkway Sunset Avenue Not Funded Shiloh Glenn Drive Slater Road NC 54 Complete Watkins Road Widening NC 54 Perimeter Parkway Partially Complete McCrimmon Parkway Grade Separation McCrimmon Parkway NC 54 Funded in 2018-2027 STIP NC 54 Widening Sunset Avenue Keybridge Dr Not Funded McCrimmon Pkwy Extension (Phase II) International Drive Extension Aviation Parkway Under Construction 4 Morrisville East Connector International Drive Extension McCrimmon Parkway Extension Not Funded Morrisville East Connector McCrimmon Parkway Extension Nova Drive Removed per Town Council Resolution Triangle Parkway NC 540 McCrimmon Parkway Funded in 2018-2027 STIP/Alternative Alignment Church Street Widening Morrisville-Carpenter Road Northern Town Limits Not Funded NC 54 Widening Keybridge Dr Cary Parkway Not Funded NC 54 Widening Cary Parkway Southern Town Limits Not Funded Carrington Mill Boulevard/Mason Farm Road Grade Separation Carrington Mill Boulevard NC 54 Not Funded 5 Little Drive Davis Dr Mason Farm Road Not Funded 6 Southport Drive Extension Southport Drive (West) NC 54 Not Funded Marcom Drive Extension Marcom Drive Watkins Road Not Funded Carrington Mill Boulevard Extension Carrington Mill Boulevard Slater Road Complete International Drive Widening Aviation Parkway International Drive (North) Not Funded Slater Road Widening Sorrel Grove Church Road NC 540 Not Funded Morrisville Parkway Grade Separation Morrisville Parkway Railroad Complete Town Hall Drive (Planted median and Restripe for Bike Lanes) McCrimmon Parkway Treybrooke Drive Not Funded 1. Status as of January 2018. 2. STIP has McCrimmon Parkway widening funded from Davis Drive to NC 54. 3. Morrisville-Carpenter Road widening project is funded from Davis Drive to the railroad. 4. McCrimmon Parkway Extension Phase II is being constructed as one project from Airport Boulevard to Aviation Parkway. 5. This grade separation was removed from the CTP Update due to cost and lack of need for the connection. 6. This extension of Little Drive was removed from the CTP Update due to existing development and the fact road extension is almost completely outside of the Town’s jurisdiction.

1-3 | P A G E D R A F T | 0 6 / 0 6 / 2 0 1 8

Made with FlippingBook - Online Brochure Maker