Davis Drive
2010 – n/a Widening
Length 3.75 miles
Project Extents
From: Wake Co. Northern Limits To: Morrisville-Carpenter Road
Traffic Volume (vpd) Street Hierarchy 2010 – 31,500 2040 – 37,100 Major Thoroughfare Congestion (v/c ratio) Planning Cost Estimate
2010 – 0.66 2040 – 0.78
$62,595,000 1 1 This cost is for the full 3.75 miles. Only 1.4 miles is within the Town’s jurisdiction, resulting in approximately $23 million.
Crash Summary (June 2013 to May 2016) Total Crashes – 201 EPDO Score – 646.8
CROSS-SECTION
KEY STANDARD DIMENSIONS
NOTES:
11-ft inside lanes 12-ft dedicated bus lane
12-ft dedicated bus lanes
Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. Bus lanes can be center-running or in the outside lanes as shown in the cross-section.
17.5-ft planted median
0-ft to 10-ft verge
10-ft sidepath
C-7 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8