DRAFT Comprehensive Transportation Plan Update: 2/23/2018 version
PROJECT SHEETS
Louis Stephens Drive
2010 – n/a Widening
Length 1.23 miles
Project Extents
From: Poplar Pike Lane To: McCrimmon Parkway Traffic Volume (vpd) Street Hierarchy 2010 – N/A 2040 – 3,263 Major Thoroughfare Congestion (v/c ratio) Planning Cost Estimate
2010 – N/A 2040 – 0.07
$15,252,000 Crash Summary (June 2013 to May 2016) Total Crashes – 1 EPDO Score – 8.4
CROSS-SECTION
KEY STANDARD DIMENSIONS
ALTERNATIVE DIMENSIONS
NOTES:
11-ft lanes
11-ft to 14-ft lanes
23-ft planted median
17.5-ft to 23-ft planted median
Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians.
5-ft minimum verge
0-ft to 10-ft verge
10-ft sidepath north side of roadway
10-ft sidepath(s)
5-ft sidewalk
5-ft to 8-ft sidewalks