Airport Boulevard
McCrimmon Parkway Extension to Garden Square Lane
Length 1.26 Miles
Street Hierarchy Major Thoroughfare
Crash Summary (6/2013-5/2016)
Traffic Volume (vpd) 2010 – 5,987
Total Crashes
32
Injury
6
Property Damage
26
2040 – 26,812
Fatalities 0 Most Predominant Rear End
Congestion (v/c ratio)
Priority Served 1. Congestion
2010 – 0.25
2. Safety 3. Transit
2040 – 0.57
Existing Conditions
Airport Boulevard currently serves as one of Morrisville’s primary gateways from I-40.
Airport Boulevard currently terminates at NC 54, with a small additional section near Davis
Drive. This disconnect creates a convoluted travel pattern, negatively impacting roadways
such as NC 54, Aviation Parkway, and McCrimmon Parkway.
Recommendations
Recommendations for Airport Boulevard include a grade separation at NC 54 and an
extension of the roadway to tie in the completed segments on either end. This will lead to
two new intersections at Town Hall Drive and Church Street. The construction of the new
roadway may potentially include a phased process, Phase 1 – Garden Square Lane to
Church Street and Phase 2 – NC 54 to Church Street. While it is preferable to create the full
connection between NC 54 and Garden Square Lane, moving this project forward in
phases provides enhancements to local connectivity with reduced financial impacts. The
Town should consider securing adequate right-of-way for separate bus lanes. After right-
of-way acquisition, the Town can construct a large planted median that will ultimately be
converted to dedicated bus lanes.
3-12 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8
Made with FlippingBook HTML5