DRAFT Comprehensive Transportation Plan Update: 2/23/2018 version
INTRODUCTION
Regional Partnerships Morrisville has been involved in regional planning initiatives that shaped the direction and future of the Town.
Morrisville was an active stakeholder in the development of the Wake County Transit Plan which outlined the expansion of regional
local bus service and the development of bus rapid transit and commuter rail.
Participation in the Triangle Bikeway Plan and Wake County Greenways Plan resulted in regional systems connecting into the Town’s
bicycle and pedestrian network.
The Town’s collaboration with CAMPO, NCDOT, and the Town of Cary resulted in funding to implement a coordinated signal
system.
Table 1-1: 2009 Transportation Plan Status Report
STATUS 1
PROJECT NAME
FROM
TO
Airport Blvd Widening
NC 54
I-40
Completed
NC 54 Widening
NC 540
McCrimmon Parkway Northern Town Limits
Funded in 2018-2027 STIP
Davis Dr (North) Widening Davis Dr (South) Widening
McCrimmon Parkway Southern Town Limits
Completed
Southern of Airport Boulevard Completed
Triangle Pkwy
NC 540 NC 540
NC 147
Completed
Louis Stephens Dr
Louis Stephens Drive (RTP)
Funded in 2018-2027 STIP
Kit Creek Rd Reconnection
Davis Drive
Kit Creek Road
Completed
Funded in 2018-2027 STIP 2
McCrimmon Pkwy Widening
Louis Stephens Drive
NC 54 NC 54
Funded/Estimated Completion 2019 3
Morrisville-Carpenter Rd Widening Western Town Limits
Morrisville Carpenter Rd @ Town Hall Dr Intersection Improvements
Church Street
Morrisville Square Way
Complete/Funded in 2018-2027 STIP
Aviation Pkwy Widening
NC 54
Eastern Town Limits
Funded in 2018-2027 STIP
International Drive Extension McCrimmon Pkwy Extension (Phase II)
International Drive (north)
Airport Boulevard
Not Funded
Under Construction 4
Airport Boulevard
International Drive Extension
Morrisville East Connector
Airport Boulevard
International Drive Extension
Not Funded
McCrimmon Pkwy Extension (Phase I)
NC 54
Perimeter Park Drive
Under Construction
Airport Boulevard Grade Separation Airport Boulevard
NC 54 NC 54
Not Funded Not Funded Not Funded
Airport Blvd Extension
Airport Boulevard in Cary
NC 54 Widening
McCrimmon Parkway
Sunset Avenue
Shiloh Glenn Drive
Slater Road
NC 54
Complete
Watkins Road Widening
NC 54
Perimeter Parkway
Partially Complete
McCrimmon Parkway Grade Separation
McCrimmon Parkway
NC 54
Committed in 2018-2027 STIP
NC 54 Widening
Sunset Avenue
Keybridge Dr
Not Funded
McCrimmon Pkwy Extension (Phase II)
Under Construction 4
International Drive Extension
Aviation Parkway
McCrimmon Parkway Extension
Morrisville East Connector
International Drive Extension
Not Funded
Removed per Town Council Resolution Committed in 2018-2027 STIP/Alternative Alignment
Morrisville East Connector
McCrimmon Parkway Extension Nova Drive
Triangle Parkway
NC 540
McCrimmon Parkway
Church Street Widening
Morrisville-Carpenter Road
Northern Town Limits
Not Funded Not Funded
NC 54 Widening
Keybridge Dr
Cary Parkway
NC 54 Widening
Cary Parkway
Southern Town Limits
Not Funded
Carrington Mill Boulevard/Mason Farm Road Grade Separation
Not Funded 5
Carrington Mill Boulevard
NC 54
Not Funded 6 Not Funded Not Funded
Little Drive
Davis Dr
Mason Farm Road
Southport Drive Extension
Southport Drive (West)
NC 54
Marcom Drive Extension
Marcom Drive
Watkins Road
Carrington Mill Boulevard Extension Carrington Mill Boulevard
Slater Road
Complete
International Drive Widening
Aviation Parkway
International Drive (North)
Not Funded Not Funded
Slater Road Widening
Sorrel Grove Church Road
NC 540
Morrisville Parkway Grade Separation
Morrisville Parkway
Railroad
Complete
Town Hall Drive (Planted median and Restripe for Bike Lanes)
McCrimmon Parkway
Treybrooke Drive
Not Funded
1.
Status as of January 2018.
2. STIP has McCrimmon Parkway widening funded from Davis Drive to NC 54. 3. Morrisville-Carpenter Road widening project is funded from Davis Drive to the railroad. 4. McCrimmon Parkway Extension Phase II is being constructed as one project from Airport Boulevard to Aviation Parkway. 5. This grade separation was removed from the CTP Update due to cost and lack of need for the connection. 6. This extension of Little Drive was removed from the CTP Update due to existing development and the fact road extension is almost completely outside of the Town’s jurisdiction.
1-3 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8
Made with FlippingBook HTML5