DRAFT Comprehensive Transportation Plan Update: 2/23/2018 version
PRIORITIZATION OF INDEPENDENT MULTI-USE PATH PROJECTS A subset of the multi-use path recommendations in Chapter 4 have been identified as independent projects. Independent projects will
have funding and implementation strategies primarily led by the Town. As a result, these projects warrant further analysis to determine how
they impact key criteria important to the success and viability of the facilities. The range of criteria considered in this analysis of
independent multi-use paths includes:
Connections to existing and proposed facilities
Activity centers served
Feasibility of construction
Funding partners
Independent multi-use paths are not grouped into near-term, mid-term, or long-term priorities. Rather, the four criteria for this assessment
can be used as a guide to strategically advance projects, depending on the specific needs of the Town at that time. Table 5-8 shows the
results of this prioritization exercise. Prioritization criteria are scored using a star system, with five stars indicating that the facility performs
very well, and one star indicating that the facility does not perform well for that specific factor. Each of the independent multi-use path
projects are shown in Figure 5-3 .
The funding partners column indicates where the Town may be able to seek additional funding opportunities to advance certain multi-use
paths. State and federal partners include NCDOT, CAMPO, and FHWA, while private partners typically include the development community
or private grant opportunities.
Table 5-8: Prioritization of Independent Multi-Use Path Projects
ACTIVITY CENTERS SERVED
FEASIBILITY OF CONSTRUCTION
GUIDING PRINCIPLES ADDRESSED
CONNECTIVITY
FUNDING PARTNERS
Town Hall Drive Sidepath (W side)
N/A
Sawmill Creek Greenway
State | Federal | Private
Morrisville Parkway Sidepath (S side)
State | Federal | Private
Airport Boulevard Sidepath (N side)
State | Federal | Private
Sorrells Grove Lake Greenway
Private
Mills Spring Greenway
State | Federal | Private
Fairview Greenway
State | Federal | Private
Park West Greenway Extension
Private
In addition to the policy, program, and facility recommendations discussed in this section, it is vital to the success of this plan that the Town
of Morrisville continues to work with and educate local citizens and businesses. While public support can encourage implementation,
opposition can significantly delay a project. It will be important to encourage advocacy and maintain focus on those issues identified as
important during preparation of the plan. Advocacy at the regional and state levels will also be essential as Morrisville seeks to fund and
implement the action items identified in this plan.
5-12 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8
Made with FlippingBook HTML5