DRAFT Comprehensive Transportation Plan Update: 2/23/2018 version

INTRODUCTION

ONLINE SURVEY An interactive online survey was available beginning in October of 2016. Over the next three months, more than 250 participants offered

input on community preferences, opinions, and issues for the various transportation modes. Participants also identified issues and potential

solutions by placing icons on a map. The online survey yielded more than 600 data points for consideration during the development of the

Plan. The following graphics capture the results of a few survey questions, while Figure 1-2 on the following page shows the results of the

interactive mapping portion. Full survey results can be found in Appendix D .

When asked to finish the sentence, “Over the last five years, transportation in Morrisville has,” survey respondents overwhelmingly

(81%) stated either significantly worsened or slightly worsened.

When asked to consider the “biggest transportation need in Morrisville,” most participants responded roadways.

Most participants expressed that transportation improvements should consider land use and the urban design features of surrounding

areas, when asked, “When planning transportation improvements, we should focus on…”

1-5 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8

Made with FlippingBook HTML5