DRAFT Comprehensive Transportation Plan Update: February 23, 2018 version

PROJECT SHEETS

Louis Stephens Drive

2010 – n/a Widening

Length 1.23 miles

Project Extents

From: Poplar Pike Lane To: McCrimmon Parkway Traffic Volume (vpd) Street Hierarchy 2010 – N/A 2040 – 3,263 Major Thoroughfare Congestion (v/c ratio) Planning Cost Estimate

2010 – N/A 2040 – 0.07

$15,252,000 Crash Summary (June 2013 to May 2016) Total Crashes – 1 EPDO Score – 8.4

CROSS-SECTION

KEY STANDARD DIMENSIONS

ALTERNATIVE DIMENSIONS

NOTES:

11-ft lanes

11-ft to 14-ft lanes

23-ft planted median

17.5-ft to 23-ft planted median

Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians.

5-ft minimum verge

0-ft to 10-ft verge

10-ft sidepath north side of roadway

10-ft sidepath(s)

5-ft sidewalk

5-ft to 8-ft sidewalks

C-9 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8

Made with FlippingBook - Online Brochure Maker