DRAFT Comprehensive Transportation Plan Update: February 23, 2018 version
ACTION PLAN
QUALITATIVE MEASURES Schools and Community Facilities Projects within ½ mile of schools and community facilities were awarded 1 point. Community facilities include parks, community centers,
and greenway trailheads.
Activity Centers Projects that serve an area designated as Business Activity Center, Neighborhood Activity Center, or Regional Activity Center in the Town’s
existing zoning classifications were awarded 1 point.
Supports Transit Routes Projects that align with existing and proposed transit routes were awarded 1 point.
PRIORITIZATION RESULTS The outcomes of this prioritization process are reflected in Table 5-8 and Figure 5-3 . It is important to note that the prioritized projects
shown here are not financially constrained – this list is independent of potential revenues and should be used as a guide to help advocate
for future funding. The prioritization process is intended to serve as a tool that allows for flexibility in the order in which projects are
implemented. This flexibility allows funding partners such as the Town, NCDOT, and CAMPO to be opportunistic and to take advantage of
future revenue as it becomes available.
Roadway Facility Improvements Using the roadway prioritization process discussed above, a series of near-term, mid-term, and long-term roadway improvements were
identified. The full list of prioritized roadway recommendations is included in Table 5-8 and shown in Figure 5-3 . Prioritization is an
effective way to help guide the allocation of future resources. However, the ultimate timeline for implementing these improvements is
subject to funding availability. Responsibility for implementing these improvements will be a blend of State, local, and private funding and
management.
Table 5-8: Prioritized Roadway Improvements
GUIDING PRINCIPLES ADDRESSED
CORRIDOR
EXTENTS
IMPROVEMENT
Near-Term Recommendations
NW Cary Parkway to Weston Parkway
NC 54
Widening
Davis Drive & Morrisville-Carpenter Road Intersection
Intersection Improvements
Wake County Northern Limits to Morrisville- Carpenter Road
Davis Drive
Widening
Intersection Improvements Intersection Improvements Intersection Improvements
Davis Drive & Morrisville Parkway Intersection
NC 54 & Morrisville Parkway Intersection
NC 54 & NW Cary Parkway Intersection
Morrisville Town Limits to NW Cary Parkway
NC 54
Widening
At-Grade Intersection Improvements
NC 54 & Morrisville-Carpenter Road Intersection
Mid-Term Recommendations
Slater Road to Factory Shops Road
Access Management
Airport Boulevard Access Management
Morrisville-Carpenter Road & NC 54 Grade Separation
Grade Separation
Davis Drive & McCrimmon Parkway Intersection
Intersection Improvements
Poplar Pike Lane to McCrimmon Parkway Weston Parkway to Perimeter Park Drive
Louis Stephens Drive
Widening
NC 54
Widening
NC 540 to Northern Town Limits Aviation Parkway to Weston Parkway
NC 54
Widening
Evans Road
Widening
Airport Boulevard & NC 54 Grade Separation
Grade Separation
5-9 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8
Made with FlippingBook - Online Brochure Maker