DRAFT Comprehensive Transportation Plan Update: February 23, 2018 version
INTRODUCTION
ONLINE SURVEY An interactive online survey was available beginning in October of 2016. Over the next three months, more than 250 participants offered
input on community preferences, opinions, and issues for the various transportation modes. Participants also identified issues and potential
solutions by placing icons on a map. The online survey yielded more than 600 data points for consideration during the development of the
Plan. The following graphics capture the results of a few survey questions, while Figure 1-2 on the following page shows the results of the
interactive mapping portion. Full survey results can be found in Appendix D .
When asked to finish the sentence, “Over the last five years, transportation in Morrisville has,” survey respondents overwhelmingly
(81%) stated either significantly worsened or slightly worsened.
When asked to consider the “biggest transportation need in Morrisville,” most participants responded roadways.
Most participants expressed that transportation improvements should consider land use and the urban design features of surrounding
areas, when asked, “When planning transportation improvements, we should focus on…”
1-5 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8
Made with FlippingBook - Online Brochure Maker