Crabtree Crossing Parkway Extension
2010 – n/a New Location
Length 0.31 miles
Project Extents
From: Morrisville- Carpenter Road To: Stardale Road Traffic Volume (vpd) Street Hierarchy Collector Street Congestion (v/c ratio) Planning Cost Estimate 2010 – N/A 2040 – N/A
2010 – N/A 2040 – N/A
$8,524,000 Crash Summary (June 2013 to May 2016) N/A
CROSS-SECTION
KEY STANDARD DIMENSIONS
ALTERNATIVE DIMENSIONS
NOTES:
12-ft lanes
11-ft to 14-ft lanes
5-ft minimum verge
0-ft to 10-ft verge
Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. Sidepaths can be provided in lieu of on-street bicycle accommodations.
N/A
10-ft sidepath(s)
5-ft sidewalks
5-ft to 8-ft sidewalks
5-ft to 6-ft bike lanes with optional buffers
5-ft bike lanes
C-6 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8