DRAFT Comprehensive Transportation Plan Update: July 23, 2018 version
PROJECT SHEETS
Morrisville-East Connector
2010 – n/a New Location
Length 0.58 miles
Project Extents
From: Current Terminus To: Watkins Road Traffic Volume (vpd) Street Hierarchy Collector Street Congestion (v/c ratio) Planning Cost Estimate
2010 – N/A 2040 – N/A 2010 – N/A 2040 – N/A
$ 5,121,352.50 Crash Summary (June 2013 to May 2016) N/A
CROSS-SECTION
KEY STANDARD DIMENSIONS
ALTERNATIVE DIMENSIONS 14-ft lanes with sharrows
NOTES:
12-ft lanes
12-ft two way left turn lane
11-ft to 12-ft two way left turn lane
Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians.
5-ft minimum verge
0-ft to 10-ft verge
N/A
10-ft sidepath(s)
5-ft sidewalks
5-ft to 8-ft sidewalks
C-11 | P A G E D R A F T | 0 7 / 2 3 / 2 0 1 8