Draft Comprehensive Transportation Plan Update_September 25
PROJECT SHEETS
International Drive
Widening and New Location
Project Extents From: Southport Drive To: Morrisville East Connector
Length 0.58
Traffic Volume (vpd) 2010 – 12,557 2040 – 34,128 Congestion (v/c ratio) 2010 – 0.37 2040 – 0.39
Street Hierarchy Collector Street
Crash Summary (3 year totals) Planning Cost Estimate $5,495,000
Total Crashes EPDO Score
0 0
CROSS-SECTION
B-8 | P A G E
September 25, 2017 Draft
Made with FlippingBook HTML5