FY2018 Recommended Budget
ENGINEERING & STORMWATER FEE DESCRIPTION Record Drawing Review - Includes 2 Reviews Note: Morrisville Only, See Town of Cary for fees related to utility As- Builts Re-submittal Record Drawing - 3rd Review and each Thereafter Stormwater As-Builts - includes 2 reviews Stormwater As-Builts - 3rd Review and each Thereafter
APPROVED FEE CHANGE
CURRENT FEE
$250
$150
$250 per BMP
$125
Miscellaneous Fees Administrative Appeal (EDCM)
$610
Alternative Standard (EDCM) - Request for alternative standard Bulletin Drawing Review - per review
$150 per request standard
$150
Interpretation (EDCM)
$205
Retaining Wall/Other Structures Submittal 1st Review
$150 $100 $500
2nd Review and each Thereafter
Riparian Buffer Variance
Stream Buffer Determination
$250 per Stream
Stormwater ERU Fee - Per Equivalent Residential Unit (ERU) and billed by Wake County
$25 per ERU
Stormwater Variance
$500
Infrastructure Fees Roadway improvements w/in or adjacent to public right-of-way includes storm drainage, grading, curb and gutter, sidewalks, paving, and street acceptance (includes 1 punch-list walkthrough, 1 post punch-list walkthrough, 1 end of warranty punch-list and 1 final acceptance walkthrough [NOTE: punch-lists are only valid for 3 months from date of inspection letter unless otherwise allowed for by the Town Engineer. Failure to complete required repairs will result in a new punch- list walkthrough being completed and re- inspection fee required]) Street Acceptance Walk Through (Punch- list) Re-inspection Roadway Improvements Re-inspection Driveway curb cut includes excavation, forming, and concrete placement
$6.00 per linear foot
$50 per street + $0.50 per linear foot
$50 per inspection
$50 per driveway opening
Re-inspection of driveway curb cut
$50 per driveway opening
87