FY2018 Recommended Budget

ENGINEERING & STORMWATER FEE DESCRIPTION Record Drawing Review - Includes 2 Reviews Note: Morrisville Only, See Town of Cary for fees related to utility As- Builts Re-submittal Record Drawing - 3rd Review and each Thereafter Stormwater As-Builts - includes 2 reviews Stormwater As-Builts - 3rd Review and each Thereafter

APPROVED FEE CHANGE

CURRENT FEE

$250

$150

$250 per BMP

$125

Miscellaneous Fees Administrative Appeal (EDCM)

$610

Alternative Standard (EDCM) - Request for alternative standard Bulletin Drawing Review - per review

$150 per request standard

$150

Interpretation (EDCM)

$205

Retaining Wall/Other Structures Submittal 1st Review

$150 $100 $500

2nd Review and each Thereafter

Riparian Buffer Variance

Stream Buffer Determination

$250 per Stream

Stormwater ERU Fee - Per Equivalent Residential Unit (ERU) and billed by Wake County

$25 per ERU

Stormwater Variance

$500

Infrastructure Fees Roadway improvements w/in or adjacent to public right-of-way includes storm drainage, grading, curb and gutter, sidewalks, paving, and street acceptance (includes 1 punch-list walkthrough, 1 post punch-list walkthrough, 1 end of warranty punch-list and 1 final acceptance walkthrough [NOTE: punch-lists are only valid for 3 months from date of inspection letter unless otherwise allowed for by the Town Engineer. Failure to complete required repairs will result in a new punch- list walkthrough being completed and re- inspection fee required]) Street Acceptance Walk Through (Punch- list) Re-inspection Roadway Improvements Re-inspection Driveway curb cut includes excavation, forming, and concrete placement

$6.00 per linear foot

$50 per street + $0.50 per linear foot

$50 per inspection

$50 per driveway opening

Re-inspection of driveway curb cut

$50 per driveway opening

87

Made with