FY2021 Budget

Planning Fee Description

FY2020 Fee

Adopted Fee Change

Temporary Sign - Temporary Directional Signage associated with Special Events Permit Temporary Sign - Temporary Directional Signage associated with Residential Developments

$25 per sign

$75 per sign

$25 per pole (One-time fee required for initial installation. This is necessary to ensure banner location & brackets comply with UDO standards) $25 per sign (One-time fee required for initial installation. This is necessary to ensure banner location & brackets comply with UDO standards)

Temporary Sign - Light Pole Banner

Temporary Sign - Banner Signs on Ground-mounted Signage:

Site Plan

Site Plan: Major Non-Residential and Mixed Use / Major Modifications (includes first 3 reviews) Note: If submitted concurrent with Construction Drawing it includes first 4 reviews. Site Plan: Major Single Family Attached and Multi-family/ Major Modifications (includes first 3 reviews) Note: If submitted concurrent with Construction Drawing it includes first 4 reviews Site Plan: Minor Non-Residential use and Mixed Use (includes first 3 reviews) Site Plan: Minor Single Family Attached and Multi-family (includes first 3 reviews)

$1,000 + $30/acre

$1,000 + $25/unit

$800 + $30/acre

$800 + $25/unit

Site Plan: Minor Modification (includes first 3 reviews)

$250 per modified plan sheet (maximum of $2000)

$600

Site Plan: 4 th review and each review thereafter Site-Specific Development Plan Designation

$600

$1,015

135

Made with FlippingBook - Online Brochure Maker