Morrisville UDO Administrative Manual, 11/1/18 version
Part 4 Appendices 4.5 Checklists
Riparian Buffer Variance Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations.
Staff Use Only
√, n/a, or w
√, n/a, or w
Application Submittal Requirement
3 Topographic contours (at intervals of not more than 5 feet)
4 Surface waters, FEMA 100-year floodway and floodway fringe boundaries, flood hazard soils
5 Boundaries and identification of riparian buffer Zones One and Two
6 Location and relevant dimensions of any proposed structures or structures proposed to be extended located within and immediately adjacent to a riparian buffer 7 Location and relevant dimensions of any existing structures, easements, etc. that substantially hinder strict compliance with the riparian buffer regulations proposed to be varied 8 Location and relevant dimensions of yards, setbacks, and other required areas that substantially hinder strict compliance with the buffer regulations proposed to be varied 9 Location and relevant dimensions of any other natural or man-made features on the parcel that substantially hinder strict compliance with the riparian buffer regulation proposed to be varied 10 Inset map showing site’s location relative to major roads 11 Title block showing name and address of site owner(s), name of plan designer, parcel identification number (PIN), date map prepared (and revised), bar scale, north arrow, and title “Riparian Buffer Variance Site Plan” D Other 1 List of the parcel identification numbers (PINs) and owners (and their mailing addresses) of all parcels adjoining, or across the street from, the parcel(s) making up the proposed development site. This is provided by the Planning Department upon request.
Structures in the Right-of-Way Encroachment Agreement
Structures in the Right-of-Way Encroachment Agreement Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √, n/a, or w Application Submittal Requirement √, n/a, or w A Documents to be Submitted
1 This completed checklist
2 Application
3 Application fee schedule and fee payment
4 Structures in the Public Right of Way Encroachment Agreement (see 4.1.3)
5 Plan (11 " x17 " or larger, signed/sealed by NC design professional) showing compliance with Section 4.3.3.C. 6 Expressed written support from either the Home Owners Association or the Property Owners Association B Other 1 List of the parcel identification numbers (PINs) and owners (and their mailing addresses) of all parcels 500 feet. This is provided by the Planning Department upon request.
Morrisville, NC
November 1, 2018
Administrative Manual
Page 4-67
Made with FlippingBook - Online catalogs