Morrisville UDO Administrative Manual, 11/1/18 version

Part 4 Appendices 4.5 Checklists

Final Plat Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations.

Staff Use Only

√, n/a, or w

√, n/a, or w

Application Submittal Requirement

16 All streams and bodies of water with buffer width and designation, including wetlands 17 Existing easements: Label with type, width, ownership, public or private, and legal reference New easements: Label with type, width, acreage, ownership, and public or private Potential new easements can include:  Private Access Easements  Public Town of Morrisville Access Easements  Conservation Easement  (Temporary) Construction Easement  Private Entry Monument/Signage and Landscape Easement  Public Town of Morrisville Greenway Easements  Private Retaining Wall Easements  Public Town of Morrisville Sidewalk Easements  Sight Triangle Easements (label with size)  Slope Easement  Public or Private Storm Drainage Easements  Stormwater Control Measure and Access Easements  Town of Cary Utility and Pipeline Easements  Public Utility Easements On ownership and public/private:  Label Town of Morrisville easements as public.  Town of Cary easements do not receive public labels.  Following public easements, include “offered for dedication”  Following private or non-public easements, include “hereby created”  Public Storm Drainage Easements do not receive an ownership label.  18 19 Acreage of right-of-way dedicated with label adjacent to the road name 20 Lot numbers (the numbering shall be consecutive for new lots) 21 Address(es) (Note: New addresses will be assigned by Town Staff as part of the 1 st review) Existing structures (*may be required by the Town to confirm compliance with setbacks and other regulations) An “*” on each lot located within a FEMA designated floodplain and the following note, “For lots with an *, a signed and sealed Federal Emergency Management Agency National Flood Insurance Program Elevation Certificate demonstrating the base flood elevation meets Town code shall be submitted with the building permit application.” 24 Zoning boundaries 25 Jurisdictional boundaries Site Data Table: (Include the following table. If an item is not applicable, it is not required in table.) Property owner: Parcel Identification Number (PIN): Total right-of-way dedication: __________ (ac) 22 23 Stormwater Control Measure and Access Easements do not receive an ownership label or private/public designation.  Town of Cary water and sewer easements are labeled as Utility and Pipeline Easements.

Total Public Town of Morrisville Greenway Easements: Total Public Town of Morrisville Sidewalk Easements: Total Public Town of Morrisville Access Easements: Total tree preservation area: __________ (ac) Total area recorded: _____________ (ac) Zoning ordinance # and list of conditions (when applicable):

26

Morrisville, NC

November 1, 2018

Administrative Manual

Page 4-61

Made with FlippingBook - Online catalogs