Morrisville Administrative Manual_September 2023

Part 4. Appendices 4.5 Checklists

4.5.5

Construction Plan Approval for Infrastructure Projects

Construction Plan Approval for Infrastructure Projects Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √, n/a, or w Application Submittal Requirement √, n/a, or w A Documents to be Submitted Electronically via Customer Self Service Online Portal 1 Set of plans – 24"x36" 2 Elevation and bench-marks referenced to National Geodetic Vertical Datum (NGVD) 3 Request for No Practical Alternatives Determination / Request for Buffer Authorization (for any proposed impacts to riparian buffers) 4 Copy of all stream determinations & signed JDs (jurisdictional determinations) 5 No Rise flood study, copy of any CLOMR or LOMR, & Elevation Certificate 6 Stormwater report 7 Road name approval from Wake County B Base Information for Each Plan Sheet 1 Name, address, and telephone number of Engineer, Architect, or Landscape Architect licensed in the State of North Carolina responsible for the plans 2 Date of drawing preparation and all revision dates 3 Sheet number and title 4 North arrow (except detail and elevation sheets) 5 The scale of the drawings listed in feet per inch in both graphic and numeric scale. Engineering scale no smaller than 1” = 25’ and larger than 1” = 100’ is recommended ( except detail & elevation sheets) 6 Seal and signature of Registered Design Professional registered in the State of North Carolina 7 Name of the proposed development in title block 8 Project & file number in lower right corner of each sheet (number assigned once project submitted) C Cover Sheet Information 1 Name of proposed development and “Construction Plan” 2 Vicinity map at 1” = 400’ with project boundary clearly marked. There must be sufficient detail and legibility to locate the project in reference to nearby roads. 3 The dates, resolution or ordinance number(s), and details of any previously approved rezoning, design, or sign guidelines for the project site 4 All general notes 5 Sheet Index (Note: The plan must be in the same order as this checklist) 6 Additional requirements for certain permitted uses per Article 4: Use Standards, of the UDO (if applicable) D Existing Conditions Survey 1 Property lines clearly presented showing all bearings and distances, with an accuracy of closure in accordance with the Standards of Practice in NC GS 4730 from a current survey. Sufficient data must be included to reproduce on the ground every straight or curved boundary line, lot line, right-of-way line, easement, and tree protection area. Survey must be signed and sealed by a North Carolina Licensed Professional Land Surveyor. 2 Names of adjoining property owners and subdivisions 3 Adjoining zoning districts – boundaries and names 4 Jurisdictional boundaries 5 Adjoining current land uses 6 Right(s)-of-way or easement(s) e.g. street, railroad, and utility 7 Street name, right-of-way width, public or private, and state road number 8 Water, sewer, natural gas, and other utility lines 9 Existing structures (buildings, fencing, etc.) 10 Topographic contours (cite source) 11 Surface waters (label top of bank) 12 Riparian buffers (label zone 1 & 2) 13 FEMA 100-year floodplain and floodway boundaries including FIRM number 14 Outline of generally forested areas (note any significant stands of trees) 15 Wetlands 16 Rock outcroppings

Morrisville, NC

August 7, 2023

Administrative Manual

Page 45

Made with FlippingBook. PDF to flipbook with ease