Morrisville Administrative Manual_September 2023
Part 4. Appendices 4.5 Checklists
4.5.9
Alternative Standards (EDCM)
Alternative Standards (EDCM) Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations.
Staff Use Only √, n/a, or w
√, n/a, or w
Application Submittal Requirement
A Documents to be Submitted
1
Detailed description of the request(s)
2
Supporting calculations, plans, and details
4.5.10
Bulletin Drawing
Bulletin Drawing Submittal Checklist For each listed item, check (√) if provided, write “ n/a ” if the feature does not exist or is not proposed, and write “ w ” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √, n/a, or w Application Submittal Requirement √, n/a, or w A Documents to be Submitted
1
A brief narrative explanation of the circumstances necessitating the change
2
11"x17" electronic plan – sealed and prepared by a qualified design professional
B
Bulletin Drawing Requirements
Features of the existing construction drawing displayed in the background of the drawing in gray scale. Proposed changes should be highlighted or clouded with brief, narrative descriptions or call-outs for each change Where applicable, a table should be included to show existing and proposed fenestration material percentages for any elevations being changed Where applicable, existing and proposed tables should be provided for any changes to the approved landscape plan and plant schedule Where applicable, the drawing should provide a reference to relevant construction detail(s) on the approved Construction Plans. Where applicable, detail/manufacturer sheets should be provided with drawings and include the title block information below “Bulletin D rawing #__” and drawing date on each sheet Reference to existing approved construction drawing to be altered, including the name, drawing number, and approval date. Town project/file number near the bottom right corner of each sheet Title block Where applicable, provide both existing and proposed drawings/illustrations for comparison
1
2
3
4
5
6
7
8
9
North arrow
10
Graphic and numeric scale.
11
Bulletin approval block near bottom right corner of each drawing sheet (see Section 4.7.12)
C
Note
A Bulletin Drawing should be submitted for a single change occurring, often only requiring one or two sheets to demonstrate. Modifications with multiple changes and amendments to the approved site plan/construction drawings will require a more in-depth review and will need to be submitted as a Minor Modification.
1
Morrisville, NC
August 7, 2023
Administrative Manual
Page 52
Made with FlippingBook. PDF to flipbook with ease