Morrisville Administrative Manual_September 2023

Part 4. Appendices 4.5 Checklists

New Telecommunication Facility Construction Plan Approval for a Site Plan (Major or Minor) Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √, n/a, or w Application Submittal Requirement √, n/a, or w 16 Location, height, and material of any fence, berm, and wall existing or proposed 17 VUA table that includes: • Square footage of VUA area • Number of required plantings, with supporting calculation (See Section 5.12.4.D, Interior Landscaping Standards, of UDO.) • Number of provided plantings

18 Location of planting strips and/or tree pits proposed to contain required street trees (See Section 5.12.6, Street Trees in the TOD and MS Districts, of UDO.) 19 Tree Protection Areas 20 The following note: All landscaping shall be maintained in perpetuity 21 The following note: All hotboxes and other on ground/free standing mechanical equipment shall be screened with vegetation prior to the issuance of a Certificate of Compliance/Occupancy K Lighting Plan 1 Location of proposed lighting fixtures (See Section 5.15, Exterior Lighting, of UDO). Pole details, including height, color, and manufacturer 2 Fixture details, including color, graphic, shape, wattage, IESNA cutoff classification, lumen rating, and manufacturer. This includes both pole and fixtures affixed to building. L Details Sheet 1 Fence (see Section 5.14, Fences and Walls, of UDO) 2 Standard details M Elevations 6 Location of screen wall for ground level mechanical equipment including shadow (height and width) of the equipment Compound Building Elevations 1 Label all building materials and colors (façade, cornices, awnings etc.) 2 Label each side of the building at north, south, east, west 3 Label the number of stories 4 Label the overall building height and the height of each story 5 The height of structures above the roofline (e.g. parapets and towers) 6 The scale of the elevations 7 Location of each on-building light fixture (not exceeding FAA minimum standards) 8 Location of roof-mounted mechanical equipment including proposed screening and a shadow (height and width) of the equipment 9 Location of screen wall for ground level mechanical equipment including shadow (height and width) of the equipment 10 Location of all utilities attached to the building Facility Elevations 1 Label all facility materials and colors 2 Label each side of the facility at north, south, east, west 3 Label the overall facility height 4 The scale of the elevations 5 Location of each on-facility light fixture (not exceeding FAA minimum standards)

Morrisville, NC

August 7, 2023

Administrative Manual

Page 76

Made with FlippingBook. PDF to flipbook with ease