Morrisville Administrative Manual_September 2023
Part 4. Appendices 4.5 Checklists
Site Plan Approval Submittal Checklist For each listed item, check (√) if provided, write “ n/a ” if the feature does not exist or is not proposed, and write “ w ” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations.
Staff Use Only
√, n/a, or w
√, n/a, or w
Application Submittal Requirement
9 Reclaimed Water • Design of the reclaimed water system should follow the standards in place. All public Reclaimed water system must be designed to meet TOC Standard Specifications Section 06500. Click here for specifications. • Provide information on pipe sizing and material. • Reclaimed Waterlines along major roadways shall be designed to meet the Town of Cary's Reclaimed Water System Master Plan: Click here for additional information. • Show air release valves on lines 6 inches and above. • Show locations of blow-off devices and their routing into the sanitary sewer. I Soil Erosion Control Plan - see Wake County Environmental Services for requirements J Latest Available Aerial Image of the Development Site 2 Stands of trees, include the location, area, predominant species, general health, estimated tree number, and average DBH 3 Specimen trees, show the location, species, general health, and DBH 4 Dead or diseased trees, where practical 5 The percentage of the development site area covered by existing tree canopy (excluding all proposed street rights-of-way, existing utility easements, and natural water surface areas) 6 All potential retention areas (1, 2, 3) See Section 5.4.4, Tree Canopy Retention, of the UDO 7 The location of trees 12” in caliper or larger that are within the streetyard buffer 8 The width and density of existing tree canopy to be preserved in lieu of new plantings for landscaping buffers L Tree Protection Plan 1 Property lines per the Existing Survey Sheet 2 The proposed percentage of the site’s tree canopy to be retained 3 Tree protection areas (must comply with Section 5.4.4, Tree Canopy Retention, of UDO) 4 Location of intersection sight distance areas for all road and driveway intersections (See EDCM for requirements) 5 Location, width, and type of all utility easements 6 Location of all buildings 7 Location of surface vehicle parking lots 8 Location of roadways and driveways and associated rights-of-way or easements 9 Location of sidewalk(s) and greenway(s) and associated easements 10 Location of grading limits 11 Boundaries of common open space and public recreation areas, including percentage of the development site 12 Boundaries of tree protection area(s) at least 10’ from the nearest tree trunk, must include locations of trunks of trees which are adjacent to the fencing and which are proposed to be protected. Must include trees 12” in caliper or larger in the streetyar d buffer(s) 13 Location and details of protective fencing, marking, and signage (See Section 5.4.6.B, Protective Fencing and Signage, of UDO.) 14 The total area and minimum width of each proposed tree preservation area M Landscape Plan 1 Property lines per the Existing Survey Sheet 2 Adjoining Zoning districts – boundaries and names 3 Adjoining current land uses 4 Location, species, and size of all existing vegetation within proposed perimeter and streetyard buffers(s) to be used towards required buffer screening 5 Location of intersection sight distance areas for all road and driveway intersections 1 Provide the month and year of when the image was taken K Tree Survey (See Section 5.4.3, Tree Survey, of UDO) 1 Property lines per the Existing Survey Sheet
Morrisville, NC
August 7, 2023
Administrative Manual
Page 11
Made with FlippingBook. PDF to flipbook with ease