Morrisville Administrative Manual_September 2023
Part 4. Appendices 4.5 Checklists
Site Plan Approval Submittal Checklist For each listed item, check (√) if provided, write “ n/a ” if the feature does not exist or is not proposed, and write “ w ” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations.
Staff Use Only
√, n/a, or w
√, n/a, or w
Application Submittal Requirement
3 The site area and the corresponding watershed area for the proposed improvements shall be delineated on the mapping 4 USGS Quad map (identify site) 5 FIRM map (identify site) 5 Wake County Soil Survey (1970 version) map (identify site) 7 Runoff coefficient calculations • Rational Formula (up to 5 acres) • SCS Method 8 Stormwater Quality (85% TSS removal)/Quantity Best Management Practices (BMPs) 9 Stormwater BMP detention routing (1, 2, 10, 25, and 100-year storm event) Q Other 1 Keynotes are not permitted 2 Provide a blank 3x5 block for approval stamps at the bottom right hand corner
Morrisville, NC
August 7, 2023
Administrative Manual
Page 16
Made with FlippingBook. PDF to flipbook with ease