Part 4. Appendices 4.5 Checklists

Concurrent Construction and Site Plan Approval (use this checklist for combined review applications)

For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations.

Staff Use Only

√, n/a, or w

√, n/a, or w

Application Submittal Requirement

5 Adjoining current land uses 6 Right(s)-of-way or easement(s) e.g. street, railroad, and utility 7 Street name, right-of-way width, public or private, and state road number 8 Water, sewer, natural gas, and other utility lines 9 Existing structures (buildings, fencing, etc.)

10 Topographic contours (cite source) 11 Surface waters (label top of bank) 12 Riparian buffers (label zones 1 & 2)

13 FEMA 100-year floodplain and floodway boundaries including FIRM number 14 Outline of generally forested areas (note any significant stands of trees) 15 Wetlands 16 Rock outcroppings 17 Cemeteries 18 Streets and driveways within 500’ of the project site 19 Other significant existing features E Site Plan

1 Property lines and distances per the Existing Survey Sheet 2 Names of adjoining property owners and subdivisions 3 Adjoining Zoning districts – boundaries and names

4 Adjoining current land uses 5 Jurisdictional boundaries 6 A table containing the following: • Current property owner • Developer • Acreage of parcel (with and without thoroughfare right-of-way dedication) • Wake County Parcel Identification Number (PIN) • Setbacks (front, side, rear, cornerside, minimum building separation, and maximum building height) • Lot width at road frontage • Zoning (current and proposed) including any overlay districts (e.g. noise) • Current principal and accessory use(s) • Proposed use(s) (see Section 4.2.4, Principal Use Table, UDO) • Proposed building square footage • Number of parking (Non-EV, EV-Ready, EVSE Installed) spaces required and proposed as well as the supporting calculation • Lot Coverage percentage including a breakdown for sidewalks, building(s), parking, drive aisles, and other non-pervious materials • Net Density (Mixed Use; Dwelling, townhouse; Dwelling, condominium; and Dwelling apartment only) • Square footage of the proposed tree preservation area • Type of and square footage of the proposed Common Open Space 7 Location and dimensions of the building(s) (Building footprint) 8 Location and dimensions of existing and proposed driveways and curb cuts on site to be developed and on adjacent properties within 500 feet of the project site 9 Location, material, and width of existing and proposed sidewalk(s), greenway(s), and crosswalk(s) on the site to be developed and on adjacent properties. 10 Location and width of existing and proposed public/private greenway(s) and access easement(s) 11 Location and width of existing and proposed rights-of-way and road widths, including road names and State Road (SR) number 12 Road name approval from Wake County 13 Location and width of existing and proposed median(s) (Measured from back of curb)

14 Location, width, and type of each perimeter buffer 15 Location, width, and type of each streetyard buffer

Morrisville, NC

August 7, 2023

Administrative Manual

Page 18