Morrisville Administrative Manual_September 2023
Part 4. Appendices 4.5 Checklists
Preliminary Subdivision Plat Approval (Type 1 or Type 2) Submittal Checklist For each listed item, check (√) if provided, write “ n/a ” if the feature does not exist or is not proposed, and write “ w ” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √, n/a, or w Application Submittal Requirement √, n/a, or w P Building Elevations – Multifamily 1 Label all building materials and colors (façade, cornices, awnings, storefronts, etc.) 2 Label each side of the building labeled at north, south, east, west 3 Label the number of stories 4 Label the overall building height and the height of each story 5 The height of structures above the roofline (e.g. parapets and towers) 6 The scale of the elevations 7 Location of each on-building light fixture
8 Location of roof-mounted mechanical equipment including proposed screening and a shadow (height and width) of the equipment 9 Location of screen wall for ground level mechanical equipment including shadow (height and width) of the equipment 10 Detail of commercial container enclosure(s), including the opaque gate 11 Location of all utilities attached to the building
Add the following tables for each building and not individual façade wall (fill in blanks)
Area of Façade Walls
______________ sf ______________ sf
Area of Window and Doors Net Total Façade Wall Area1 ______________ sf [1] Net Total Façade Wall Area is the Area of Façade Walls minus Area of Window and Doors
12
Area of predominant net façade material ____________ sf ____________% Area of non-predominant net façade material ____________ sf ____________%
13 Location and dimensions of proposed dumpster, recycling container, and/or trash compactor(s) Q Building Elevations – Type II Subdivision 1 Elevations demonstrating compliance with the Voluntary Design Guidelines (façade type a, b, c, etc) 2 Plat map corresponding with the elevations showing the locations of each type of unit (a, b, c, etc) R Stormwater Report 1 Preliminary runoff calculations report for all proposed storm drainage structures including, but not limited to culverts, storm drain systems, inlets, ditches, open channels, BMPs, outlet protection, etc. 2 Pre- and Post-Development Drainage Area Maps (on a full-size plan sheet) 3 The site area and the corresponding watershed area for the proposed improvements shall be delineated on the mapping 4 USGS Quad map (identify site) 5 FIRM map (identify site) 6 Wake County Soil Survey (1970 version) map (identify site) 7 Runoff coefficient calculations • Rational Formula (up to 5 acres) • SCS Method 8 Stormwater Quality (85% TSS removal)/Quantity Best Management Practices (BMPs) 9 Stormwater BMP detention routing (1, 2, 10, 25, and 100-year storm event) S Other 1 Keynotes are not permitted 2 Include a blank 3x5 block for approval stamps at the bottom right hand corner
Morrisville, NC
August 7, 2023
Administrative Manual
Page 35
Made with FlippingBook. PDF to flipbook with ease