Section 7: Stormwater Management 7.2 Design 7.2.4 Best Management Practices
Final Construction Plan Approval. A draft should be submitted during the review process, with final execution being a condition of Final Construction Plan Approval. A performance security shall be posted in order to obtain final As-Built Survey approval. See Section 7.4.4, Performance Security for Installation and Performance, of the UDO.