Part 4 Appendices Checklists

New Telecommunication Facility Construction Plan Approval for a Site Plan (Major or Minor) Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √, n/a, or w Application Submittal Requirement √, n/a, or w • 10-yr (contained in pipe) & 25-yr (contained in structures) HGL calculations & profiles

• Swale calculations showing non-erosive flow for 10-yr storm • Gutter spread calculations for 4 in/hr storm (8ft max spread) • Culvert calculations (energy equation & nomographs) • Rip rap apron calculations/nomographs 11 Stormwater Quality (85% TSS removal)/Quantity Best Management Practices (BMPs) • Stormwater BMPs must be designed in accordance with the NCDENR Stormwater BMP Design Manual or the Minimum Design Criteria (MDC), and any supplements to it issued by the Town of Morrisville including the Town of Morrisville EDCM and Policy or Technical Memorandums, • Stormwater BMP detention routing (1, 2, 10, 25, and 100-year storm events) • Provide 1 foot of freeboard from the top of any dam embankment during the 100-year storm event • Permanently stabilized emergency spillway must be provided • Water Quality Computations and BMP sizing/drawdown for the 1-inch (1”) runoff depth 12 Nutrient Calculations: copy (of all tabs) & .xls file of completed J/F Nutrient Loading Accounting Tool 13 BMP Operation and Maintenance manual • Engineers estimate for BMP. Provide detailed, line-item bid summary with item/activity description, unit price, amount of units, and total cost. • Maintenance surety calculation (30% cash payment) • Draft O&M agreement with site-specific data included for review prior to execution and recordation O Other 1 Keynotes are not permitted 2 A statement on letterhead from a qualified individual that the applicant will comply with all FCC rules regarding human exposure to radio frequency (RF) energy, along with the individual’s qualifications 3 A statement on letterhead from a qualified individual that the applicant will comply with all FCC rules regarding RF interference 4 A map of the same search ring submitted and used by the applicant’s site locator 5 A map indicating applicant’s existing RF signal propagation 6 A statement on letterhead from a qualified individual that the submitted search ring is the same as utilized in the selection of the site 7 A structural certification by a Registered North Carolina Professional Engineer that the facility complies with applicable Federal, State and County building codes 8 Documentation of notification to property owners within 500 feet and Planning Department of the date and time of balloon testing 9 Results of balloon testing 10 Supplemental information may be requested for purposes of clarity or confirmation

Morrisville, NC

September 13, 2019

Administrative Manual

Page 4-71

Made with FlippingBook flipbook maker