Site Plan Approval (Major of Minor) Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations.

Staff Use Only

√, n/a, or w

√, n/a, or w

Application Submittal Requirement

3 The site area and the corresponding watershed area for the proposed improvements shall be delineated on the mapping 4 USGS Quad map (identify site) 5 FIRM map (identify site) 5 Wake County Soil Survey (1970 version) map (identify site) 7 Runoff coefficient calculations • Rational Formula (up to 5 acres) • SCS Method 8 Stormwater Quality (85% TSS removal)/Quantity Best Management Practices (BMPs) 9 Stormwater BMP detention routing (1, 2, 10, 25, and 100-year storm event) Q Other 1 Keynotes are not permitted

September 13, 2019

Morrisville, NC

Page 4-14

Administrative Manual

Made with FlippingBook flipbook maker