Morrisville UDO Administrative Manual - February 2020

Part 4 Appendices Checklists

Preliminary Subdivision Plat Approval (Type 1 or Type 2) Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √, n/a, or w Application Submittal Requirement √, n/a, or w • Key symbol (e.g. “AR” for Acer Rubrum”) • Quantity

• Scientific name • Common name

• Caliper at planting • Height at planting • Root (e.g. B&B) • Spacing • Location (streetyard, VUA, foundation etc.) 13 Location, width, and type/option of perimeter and streetyard buffer(s) 14 Table for each perimeter and streetyard buffer that includes: • Buffer type and option • Length (linear feet) of buffer • Number of required plantings (including supporting calculation) • Number of provided plantings • Location, height, material, and graphic of fences/walls proposed as buffer screening • Location, width, and height of proposed berms 15 Location and width of perimeter landscaping strips between Vehicle Use Areas (VUAs) and adjacent streets and property lines (See Section 5.12.4.C, Perimeter Landscaping, of UDO.) 16 Location, height, and material of any fence, berm, and wall existing or proposed 17 Location of planting islands within and between parking bays 18 Area and dimensions of each planting island in VUAs 19 VUA table that includes: • Square footage of VUA area • Number of required plantings, with supporting calculation (See Section 5.12.4.D, Interior Landscaping Standards, of UDO.) • Number of provided plantings 20 Location and depth of foundation planting areas (See Section 5.12.5, Foundation Plantings, of UDO.) 21 Location of planting strips and/or tree pits proposed to contain required street trees (See Section 5.12.6, Street Trees in the TOD and MS Districts, of UDO.) 22 Tree Protection Areas 23 The following note: All landscaping shall be maintained in perpetuity 24 The following note: All hotboxes and other on ground/free standing mechanical equipment shall be screened with vegetation prior to the issuance of a Certificate of Compliance/Occupancy M Lighting Plan 1 Location of proposed lighting fixtures (See Section 5.15, Exterior Lighting, of UDO) pole details, including height, color, and manufacturer 2 Fixture details, including color, graphic, shape, wattage, IESNA cutoff classification, lumen rating, and manufacturer. This includes both pole and fixtures affixed to building. 3 Footcandle grid (Not required on public streets) 4 Summary table that shows minimum, average and maximum FC values as well as the average to minimum uniformity ratio (Not required on public streets) 5 Maintenance factor (Not required on public streets) 6 Streetlight pole locations (This does include thoroughfares adjacent to the project) N Details Sheet 1 Fence (see Section 5.14, Fences and Walls, of UDO)

September 13, 2019

Morrisville, NC

Page 4-30

Administrative Manual

Made with FlippingBook flipbook maker