Morrisville UDO Administrative Manual - May 2020

Part 4. Appendices 4.5 Checklists

New Telecommunication Facility Construction Plan Approval for a Site Plan (Major or Minor) Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √, n/a, or w Application Submittal Requirement √, n/a, or w E Site Plan

1 Property lines and distances per the Existing Survey Sheet 2 Names of adjoining property owners and subdivisions 3 Adjoining Zoning districts – boundaries and names

4 Adjoining current land uses 5 Jurisdictional boundaries 6 A table containing the following: • Current property owner • Leasee • Developer • Acreage of parcel (with and without thoroughfare right-of-way dedication) • Lease area

• Wake County Parcel Identification Number (PIN) • Leased area setbacks (front, side, rear, cornerside) • Minimum separation and maximum structure height) • Facility height and accessory building height(s) if applicable • Fall zone • Lot width at road frontage (if applicable) • Zoning (current and proposed) including any overlay districts (e.g. noise) • Current principal and accessory use(s) • Proposed use(s) (see Section 4.2.4, Principal Use Table, UDO) • Proposed building square footage (if applicable) • Number of parking spaces required and proposed as well as the supporting calculation • Lot Coverage percentage including a breakdown for sidewalks, building(s), parking, drive aisles, and other non-pervious materials 7 Location and dimensions of the facility (facility footprint) 8 Location and dimensions of existing and proposed driveways and curb cuts on site to be developed and on adjacent properties within 500 feet of the project site 9 Location, material, and width of existing and proposed sidewalk(s), greenway(s), and crosswalk(s) on the site to be developed and on adjacent properties. 10 Location and width of existing and proposed public/private greenway(s) and access easement(s) 11 Location and width of existing and proposed rights-of-way and road widths, including road names and State Road (SR) number 16 Location and dimensions of proposed hotboxes, HVAC units, and other on ground/free standing mechanical equipment 17 Width and depth of parking bays 18 Width of drive aisle 19 Turning radius at entrances and traffic islands 20 Location, width, and type of each riparian buffer encroaching within the site measured from the top of the stream bank 21 Location and width of fire lane (if applicable) 22 Length of fire access roadway(s) with any required turnarounds 23 An “*” on each lot indicating that the lot, or a portion of the lot, is located within a designated FEMA floodplain with a corresponding note that referencing Section 5.6, Floodplain Management, of the UDO and the corresponding requirements 24 Wastewater System 12 Location, width, and type of each perimeter buffer 13 Location, width, and type of each streetyard buffer 14 Location and width of minimum setbacks 15 Location and width of landscape buffer around compound area

Morrisville, NC

May 29, 2020

Administrative Manual

Page 4-66

Made with FlippingBook HTML5