Morrisville UDO Administrative Manual - May 2020

Part 4. Appendices 4.5 Checklists

Site Plan Approval (Major of Minor) Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations.

Staff Use Only

√, n/a, or w

√, n/a, or w

Application Submittal Requirement

O Building Elevations 1 Label all building materials and colors (façade, cornices, awnings, storefronts, etc.) 2 Label each side of the building labeled at north, south, east, west 3 Label the number of stories 4 Label the overall building height and the height of each story 5 The height of structures above the roofline (e.g. parapets and towers) 6 The scale of the elevations 7 Location of each on-building light fixture

8 Location of roof-mounted mechanical equipment including proposed screening and a shadow (height and width) of the equipment 9 Location of screen wall for ground level mechanical equipment including shadow (height and width) of the equipment 10 Detail of commercial container enclosure(s), including the opaque gate 11 Location of all utilities attached to the building

Add the following tables for each structure (fill in blanks)

Area of Façade Walls

______________ sf ______________ sf

Area of Window and Doors Net Total Façade Wall Area1

______________ sf 1 Net Total Façade Wall Area is the Area of Façade Walls minus Area of Window and Doors

12

Area of predominant net façade material ____________ sf ____________% Area of non-predominant net façade material ____________ sf ____________%

13 For an office building greater than two feet in height, provide building footprint demonstrating the minimum corner requirement is met if this method of compliance it proposed. Provide a scaled drawing, similar to the one below, for all buildings that have at least one side greater than 100 feet in length.

14

Note: This is not to scale.

Morrisville, NC

May 29, 2020

Administrative Manual

Page 4-12

Made with FlippingBook HTML5