Morrisville UDO Administrative Manual, version August 1, 2018
Part 4 Appendices 4.5 Checklists
Construction Plan Approval for a Site Plan (Major or Minor) Submittal Checklist (use this checklist for concurrent review applications) For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only
√, n/a, or w
√, n/a, or w
Application Submittal Requirement
All existing and proposed easements FEMA 100-year floodplain and floodway boundaries including FIRM number Surface waters (show & label top of bank) & wetlands Location, width, and type of each riparian buffer encroaching within the site measured from the top of the stream bank Show all building roof leaders
H Utility Plans 1 Property lines distinctly and accurately represented. 2 Fire flow for building or project.
3 General – This information may be incorporated from other sheets within the construction plan submittal set. Add following note to each Utility Plan sheet: “All Town of Cary utility construction shall be performed in accordance with Town of Cary Standard Specifications and Details in effect at time of utility permitting.” Phased projects have unique requirements, including individual permit requirements. See subsequent section: Phased Plan Submittals Provide an overall utility plan on a single sheet with a key to subsequent individual utility sheets. Show and label all retaining walls on the utility sheets. Include the extent of all structural elements including footings, tie-backs, geofabric, etc. The utilities and the entire easement will need to be free of these structural elements. Include any proposed requests for oversized line(s) and label as such. Indicate projected sewer flow (gpd) (adf) for development submitted, and verify consistency with Town’s Master Plan. List the total linear footage of proposed sanitary sewer line. Include this information in the site data table. Provide sewer plan and profile (include pipe material, line size, length, slope, stationing, utility separations, ground elevation, and manhole inverts in, inverts out and top elevations, diameters). Show existing and proposed easements for all sewer lines, indicate status of easement acquisition across any off-site properties. Verify easement width for proposed depth. Show sewer line services and cleanouts (first cleanout required at the edge of the public easement or r/w) to each lot. Show service perpendicular to the main. If a pump station is being considered, it is suggested you discuss this in advance with the Cary Utility Engineering staff. Specific information submittal needs are available on the Town’s website and by contacting staff. Note and label each individual lot that cannot be served by gravity sewer. Please clearly note on the plans any private sewer. This will require a private extension permit from the state. Additional information can be obtained on the State DWQ website. Show extensions of sewer to all upstream areas within the gravity sewer basin. Include accompanying easement. Label all manholes that are greater than 4’ in diameter. Waterlines along major roadways shall be designed to meet the Town of Cary's Water system Master Plan: http://www.townofcary.org/Assets/Water+Resources+Department/Water+Model.pdf Plan shall include plan and profile views. All public water system must be designed to meet TOC Standard Specifications Section 06000. http://www.townofcary.org/Assets/Water+Resources+Department/Drawings/Specification s/Approved/Section+06000.pdf 5 Water System 4 Wastewater System
Morrisville, NC
August 1, 2018
Administrative Manual
Page 4-29
Made with FlippingBook Online newsletter