Morrisville Unified Development Ordinance - February 2021.1
Industrial Management (IM) District
3.6.4.
Industrial Management (IM) District
A. Purpose
In accordance with the Comprehensive Plan, the Industrial Management District accommodates industrial uses (e.g., manufacturing, distribution, wholesale operations, warehouses, research facilities, flex space, and business parks) that are compatible and integrated with the Town’s office, commercial, and other employment or institutional uses. The district also accommodates limited retail and commercial uses that serve the needs of nearby industrial uses. Campus-style industrial parks are appropriate along major transportation corridors, while warehouse, manufacturing, and repair uses should be located along less visible industrial collector roads.
B. Principal Intensity and Dimensional Standards
Cross References
A, etc. are symbols used in the illustrations showing application of dimensional standards
Industrial Uses
Other Uses
Art. 4: Use Standards
Lot Standards
Art. 5: Development Standards
Min. Net Lot Area (sf)
80,000
80,000
Sec. 5.14.8.A.2
A
Min. Lot Width (ft)
200 n/a
200 n/a
Art. 6: Riparian Buffers
Max. Net Density (du/ac) Max. Lot Coverage (%)
Art. 7: Stormwater Management
65
65
Setbacks (also see height standard) B Min. Front (ft)
30
30
C
Min. Side (ft)
20
20
D
Min. Corner Side (ft)
20
20
E
Min. Rear (ft)
30
30
Building Standards F
Max. Structure Height (ft)
50
100
G Min. Building Separation (ft) n/a Notes: sf = square feet; ft = feet; du = dwelling unit; ac = acre; % = percent; n/a = not applicable n/a
Morrisville, NC
February 1, 2021
Unified Development Ordinance
Page 3-49
Made with FlippingBook - professional solution for displaying marketing and sales documents online