Morrisville Unified Development Ordinance - July 2021.1

Article 2: Administration Section 2.5. Application-Specific Review Procedures 2.5.10. Riparian Buffer Development Review

b. Expiration of Approval A Floodplain Development Permit shall expire if an application for a Building Permit (or Certificate of Compliance/Occupancy, if a Building Permit is not required) for the approved development is not submitted within two years after the date of the Construction Plan Approval, As-Built Elevation Certificate Before a Certificate of Compliance/Occupancy may be approved for development subject to the Floodplain Development Permit, the applicant shall submit a final, “as - built” elevation certificate prepared by, or under the direct supervision of, a professional land surveyor or engineer to the Town Engineer for approval. d. Inspections Town staff and agents may inspect sites undergoing development authorized by a Floodplain Development Permit to determine whether development activities conform to approved plans and terms of the permit and comply with non-encroachment requirements. C. Floodplain Development Permit Review Standards An application for a Floodplain Development Permit shall be approved only if the Town Engineer determines that the proposed development complies with all applicable standards in Section 5.6, Floodplain Management. c.

(Ord. No. 2014-051, 11/10/2014)

2.5.10. Riparian Buffer Development Review

See Section 6.5, Riparian Buffer Development Review.

2.5.11. Stormwater Management Permit

See Section 7.2, Administration and Procedures.

2.5.12. Sign Permit

A. Applicability

1.

General The procedure and standards in this subsection apply to the review of applications for a Sign Permit, which shall be required before the erection, installation, construction, alteration, or moving of any sign unless exempted from this Ordinance signage regulations in accordance with subsection 2 below, or from the permit requirements in accordance with subsection 3 below.

2.

Signs Exempt from Regulation

Signs exempt from the signage regulations of this Ordinance are listed in Section 5.16.2.B, Exemptions.

3.

Signs Exempt from Sign Permit Requirement

Signs subject to this Ordinance’s signage standards, but exempt from the requirement for a Sign Permit are listed in Section 5.16.2.C, Signs Not Requiring a Sign Permit. B. Sign Permit Procedure The following subsections identify those steps in the standard review procedure (see Section 2.4) applicable to the review of a Sign Permit application and note any specific variations of, or additions to, those review steps.

Morrisville, NC

February 1, 2021

Unified Development Ordinance

Page 2-49

Made with FlippingBook - Online catalogs