Morrisville Unified Development Ordinance - July 2021
Article 2: Administration Section 2.5. Application-Specific Review Procedures 2.5.5. Special Use Permit
1. Proposed uses and development intensities are consistent with applicable district and use standards and do not preclude comp liance with this Ordinance’s specific use, intensity, and dimensional standards; 2. Proposed layouts of vehicular circulation routes are consistent with the purposes and intent of the general access and circulation standards of this Ordinance, and do not preclude compliance with the Ordinance’s more detailed access and circulation standards; 3. The proposed size, layout, and timing of water, sewer, and other major infrastructure systems are consistent with the general infrastructure standards of this Ordinance, and do not preclude compliance with the Ordinance’s more detailed infrastructure standards; 4. The proposed size and arrangement of developed areas in relationship to drainage systems on and adjacent to the site are consistent with the purposes and intent of the general stormwater management and water quality standards of this Ordinance, and do not preclude compliance with this Ordinance’s more detailed stormwater and water quality standards; 5. The proposed size and arrangement of major open space areas and developed areas are consistent with the general open space and natural resource protection standards in this Ordinance, and do not preclude compliance with this Ordinance’s specific open space and natural resource standards; 6. The proposed arrangement of other development elements are consistent with the purposes and intent of the general development standards of this Ordinance, and do not preclude compliance with the Ordinance’s more detailed development and design standards; and 7. The proposed types and arrangements of uses, development intensities, and major development elements would allow the development to be compatible with existing and proposed surrounding uses and developments.
(Ord. No. 2014-051, 11/10/2014)
Special Use Permit
2.5.5.
A. Purpose A use designated as a Special Use in a particular zoning district is a use that may be appropriate in the district, but because of its nature, extent, and external effects, requires special consideration of its location, design, and methods of operation before it can be deemed appropriate in the district and compatible with its surroundings. Special Use Permits shall be approved upon the presentation of the competent, material, and substantial evidence establishing compliance with the standards identified in subsection D of this section. The applicant must provide written consent to any conditions placed on the approval. The purpose of this section is to establish a mechanism to review Special Uses to ensure they are appropriate as and where proposed. 1. The procedure and standards in this subsection apply to the review of any proposed development involving a Special Use as designated in the Use Tables in Section 4.2.4, or proposed development for which a Special Use Permit is required by any other provision of this Ordinance. 2. An application for a Special Use Permit may be submitted and reviewed concurrently with an application for Site Plan Approval (and any other application submitted and reviewed concurrently with the B. Applicability
Special Use Permit
Pre-Application Conference
Application Submittal and Acceptance
Staff Review and Recommendation with DRC review
Scheduling and Notice of Meetings
Town Council Review and Decision with quasi-judicial hearing
Morrisville, NC
February 1, 2021
Unified Development Ordinance
Page 2-32
Made with FlippingBook - Online Brochure Maker